WELL · 42-133-38046 · DISTRICT 9
Hogtown Moore Unit #40H
Eastland County · Newark East (Barnett Shale) field · Horizontal
Hogtown Moore Unit #40H (API 42-133-38046) is a plugged horizontal well in Eastland County, plugged September 10, 2021, last operated by Greenhaw Morris R..
The RRC has issued one drilling permit, issued August 10, 2007, permitted to 4,000 ft.
It was permitted by Square One Energy, Inc. and has since transferred to Greenhaw Morris R. on the wellbore schedule.
Completion filings report 4 formation tops, including Gray Lime, Duke Sand, Duffer, Barnett.
Operator of record
Permitted by Square One Energy, Inc.; the EWA schedule now lists a different operator.
Desdemona, TX · P-5 Y, filed Jul 4, 2026 · 9 permits on file · (254) 977-2138
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Greenhaw Morris R. |
| Production reports | Greenhaw, Morris R.through Sep 2021 |
| Latest permit | Square One Energy, Inc.Aug 10, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Aug 10, 2007
- last permit issued
- Sep 18, 2007
- completed
- 0
- cumulative oil, bbl
- 14.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2007 THROUGH Sep 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 18, 2007
- Shut in
- —
- Plugged
- Sep 10, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hogtown Moore Unit G-13-252506 | Newark, East (Barnett Shale) | Greenhaw, Morris R. | 1 | 0 | 14.2K | Oct 2007 – Sep 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Square One Energy, Inc.Oct 2007 → Sep 2010
- 2Greenhaw, Morris R.Nov 2016 → Sep 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 641657-99 | Drill | Square One Energy, Inc. | Jun 29, 2007 | Aug 10, 2007 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-252506 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,381 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,170 | 4,180 | Perforated |
| 4,770 | 4,780 | Perforated |
| 5,430 | 5,440 | Perforated |
| 6,000 | 6,010 | Perforated |
| 6,500 | 6,510 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 281 | 13.5 | 250 S |
| 5.5 | 6,589 | 7.875 | 1,380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 21, 2010 | Jul 11, 2008 | Yes |
| 00 | Nov 6, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-38046 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-38046 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13338046, documented in the API reference.