WELL · 42-133-38192 · DISTRICT 7
Thornton #1B
Eastland County · LBS (Caddo) field · NO Production · Vertical
Thornton #1B (API 42-133-38192) is a well in Eastland County operated by At Oil & Gas LLC, completed July 10, 2013 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued December 12, 2012, permitted to 3,000 ft.
It was permitted by Bustamante Oil Company and has since transferred to At Oil & Gas LLC on the wellbore schedule.
Completion filings report one formation top, including Caddo.
Its lease has reported 5.62K barrels of oil and 334 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Bustamante Oil Company; the EWA schedule now lists a different operator.
Eastland, TX · P-5 Y, filed Nov 4, 2025 · (817) 556-1008
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | AT Oil & Gas LLC |
| Production reports | AT Oil & Gas, LLCthrough Mar 2026 |
| Latest permit | Bustamante Oil CompanyDec 12, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Dec 12, 2012
- last permit issued
- Jul 10, 2013
- completed
- 5.62K
- cumulative oil, bbl
- 334
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 10, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thornton O-8-15517 | LBS (Caddo) | AT Oil & Gas, LLC | 2 | 5.62K | 334 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 45 · prior 12 44(+2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Executive Energy Co.Jan 1993 → Dec 1996
- 2Supreme Energy Company, Inc.Jan 1997 → May 2010
- 3Rock OperatingApr 2000 → Jan 2006
- 4Bustamante Oil CompanyJun 2013 → Jan 2014
- 5AT Oil & Gas, LLCFeb 2014 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 752350-99 | Drill | Bustamante Oil Company | Nov 29, 2012 | Dec 12, 2012 | Feb 25, 2013 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-15517 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,648 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CaddoCADDO LIME | 2,686 | -1,038 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,688 | 2,702 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 311 | 11 | 175 S |
| 4.5 | 2,790 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 2015 | Aug 12, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-38192 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-38192 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13338192, documented in the API reference.