WELL · 42-135-04642 · DISTRICT 8

Slator J. D. #3

Y

Ector County · TXL (Ellenburger) field · Producing  · Horizontal · Sidetrack

Slator J. D. #3 (API 42-135-04642) is a horizontal well in Ector County operated by Aghorn Operating Inc., completed March 26, 2020 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued February 13, 1995, permitted to 9,300 ft.

It was permitted by Marathon Oil Company and has since transferred to Aghorn Operating Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Rstlr, Devonian, Silurian (undifferentiated), Fusselman.

Its lease has reported 311K barrels of oil and 882K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Aghorn Operating Inc.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Odessa, TX · P-5 Y, filed Apr 4, 2026 · 5 permits on file · (432) 256-5026

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAghorn Operating Inc.
Production reportsAghorn Operating, Inc.through Feb 2026
Latest permitMarathon Oil CompanyFeb 13, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,300
total depth, ft
3
permits on file
Feb 13, 1995
last permit issued
Mar 26, 2020
completed
311K
cumulative oil, bbl
882K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 26, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slator, J. D. O-10-6959TXL (Ellenburger)Aghorn Operating, Inc.2311K882KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 83 · prior 12 133(-38%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Oct 1998
  2. 2Aghorn Operating, Inc.Nov 1998 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
432883-97Recompletion · sidetrackMarathon Oil CompanyJun 30, 1995Feb 13, 1995Mar 15, 19959,300
432883-98Recompletion · sidetrackMarathon Oil CompanyMar 14, 1995Feb 13, 1995—9,300
432883-99Recompletion · sidetrackMarathon Oil CompanyFeb 13, 1995Feb 13, 1995—9,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-6959————

Formation tops

As filed on W-2/G-1. Subsea from 3,291 ft elevation.Download CSV →

FormationMD ftSubsea
Rstlr1,4001,891
Devonian7,786-4,495
Silurian (undifferentiated)SILURIAN7,889-4,598
Fusselman8,244-4,953
Ellenburger9,131-5,840

Perforations

Perforated and open-hole intervals.

FromToType
9,13910,646Perforated
9,2759,338Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37530517250 S
13.3753,826—250 S
8.6253,826113,000 S
8.6253,826—3,000 S
5.59,3577.751,000 S
5.59,357—1,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 2023Feb 10, 2023—
00Dec 21, 1995Jun 30, 1995—
00Sep 28, 1992Jun 22, 1992—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13504642, documented in the API reference.