WELL · 42-135-05006 · DISTRICT 8

Ratliff, Sallie W. -A- #1

N

Ector County  · Vertical

Ratliff, Sallie W. -A- #1 (API 42-135-05006) is a permitted well in Ector County filed by Baber Well Servicing CO.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1986 and 1991, permitted to 12,240 ft.

Completion filings report one formation top, including Bend.

Its 2 leases have reported 6.62K barrels of oil and 93 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Baber Well Servicing Co.

Hobbs, NM · P-5 Y, filed Oct 1, 1999 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPronghorn Management Corporationthrough Jul 2012
Latest permitBaber Well Servicing Co.Feb 8, 1991
12,240
total depth, ft
3
permits on file
Feb 8, 1991
last permit issued
—
completed
6.62K
cumulative oil, bbl
93
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ratliff -E- O-10-33023Headlee (Bend)Pronghorn Management Corporation16.62K93Jan 1993 – Jul 2026
— O-10-31138——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Antelope Production Co.Mar 1993 → Aug 1995
  2. 2Antelope Energy Company, LLCSep 1995 → Aug 2006
  3. 3Pronghorn Management CorporationSep 2006 → Jul 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
383567-99RecompletionBaber Well Servicing Co.Jan 17, 1991Feb 8, 1991Feb 8, 199112,010
341666-99RecompletionSun Expl. & Prod. Co.-MidlandJan 20, 1988Jan 20, 1988—12,240
321133-99RecompletionTexaco Inc.Sep 26, 1986Sep 26, 1986—12,010

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-31138————
—— O-10-33023————

Formation tops

As filed on W-2/G-1. Subsea from 3,018 ft elevation.Download CSV →

FormationMD ftSubsea
Bend10,924-7,906

Perforations

Perforated and open-hole intervals.

FromToType
10,92410,945Perforated
11,57511,676Perforated
—12,210Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375370——
13370——
8.6254,86012.25—
2.87510,9197.875—
2.87510,919——
3.512,2367.8751,400 S
5.513,870——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 1991Feb 20, 1991Yes
00Mar 8, 1991——
00Apr 6, 1987Mar 23, 1987Yes
00Apr 1, 1987——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13505006, documented in the API reference.