WELL · 42-135-05006 · DISTRICT 8
Ratliff, Sallie W. -A- #1
Ector County · Vertical
Ratliff, Sallie W. -A- #1 (API 42-135-05006) is a permitted well in Ector County filed by Baber Well Servicing CO.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1986 and 1991, permitted to 12,240 ft.
Completion filings report one formation top, including Bend.
Its 2 leases have reported 6.62K barrels of oil and 93 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Hobbs, NM · P-5 Y, filed Oct 1, 1999 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Pronghorn Management Corporationthrough Jul 2012 |
| Latest permit | Baber Well Servicing Co.Feb 8, 1991 |
- 12,240
- total depth, ft
- 3
- permits on file
- Feb 8, 1991
- last permit issued
- —
- completed
- 6.62K
- cumulative oil, bbl
- 93
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ratliff -E- O-10-33023 | Headlee (Bend) | Pronghorn Management Corporation | 1 | 6.62K | 93 | Jan 1993 – Jul 2026 |
| — O-10-31138 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Antelope Production Co.Mar 1993 → Aug 1995
- 2Antelope Energy Company, LLCSep 1995 → Aug 2006
- 3Pronghorn Management CorporationSep 2006 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 383567-99 | Recompletion | Baber Well Servicing Co. | Jan 17, 1991 | Feb 8, 1991 | Feb 8, 1991 | 12,010 |
| 341666-99 | Recompletion | Sun Expl. & Prod. Co.-Midland | Jan 20, 1988 | Jan 20, 1988 | — | 12,240 |
| 321133-99 | Recompletion | Texaco Inc. | Sep 26, 1986 | Sep 26, 1986 | — | 12,010 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-31138 | — | — | — | — |
| — | — O-10-33023 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,018 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bend | 10,924 | -7,906 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,924 | 10,945 | Perforated |
| 11,575 | 11,676 | Perforated |
| — | 12,210 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 370 | — | — |
| 13 | 370 | — | — |
| 8.625 | 4,860 | 12.25 | — |
| 2.875 | 10,919 | 7.875 | — |
| 2.875 | 10,919 | — | — |
| 3.5 | 12,236 | 7.875 | 1,400 S |
| 5.5 | 13,870 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 17, 1991 | Feb 20, 1991 | Yes |
| 00 | Mar 8, 1991 | — | — |
| 00 | Apr 6, 1987 | Mar 23, 1987 | Yes |
| 00 | Apr 1, 1987 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-05006 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-05006 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13505006, documented in the API reference.