WELL · 42-135-07122 · DISTRICT 8
TXL 19 #4
Ector County · York (Queen-Grayburg) field · Vertical
Txl 19 #4 (API 42-135-07122) is a plugged well in Ector County, plugged July 12, 2019, last operated by Endeavor Energy Resources L.P..
The RRC has issued one drilling permit, issued October 14, 1993, permitted to 12,650 ft.
It was permitted by Denbury Management, Inc. and has since transferred to Endeavor Energy Resources L.P. on the wellbore schedule.
Completion filings report 2 formation tops, including Queen, Grayburg.
Operator of record
Endeavor Energy Resources L.P.
Permitted by Denbury Management, Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Apr 4, 2026 · 6,190 permits on file · (855) 247-5920
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Endeavor Energy Resources L.P. |
| Production reports | Endeavor Energy Resources L.P.through Jul 2006 |
| Latest permit | Denbury Management, Inc.Oct 14, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,650
- total depth, ft
- 1
- permits on file
- Oct 14, 1993
- last permit issued
- Dec 7, 1993
- completed
- 0
- cumulative oil, bbl
- 273K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1993 THROUGH Jul 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 7, 1993
- Shut in
- —
- Plugged
- Jul 12, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| TXL "19" G-10-147531 | York (Queen-Grayburg) | Endeavor Energy Resources L.P. | 1 | 0 | 273K | Dec 1993 – Jul 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Denbury Management, Inc.Dec 1993 → Nov 1996
- 2J-E Production, Inc.Jun 1999 → Dec 2000
- 3Smith & Marrs Inc.Jan 2001 → Aug 2002
- 4BC Operating, Inc.Sep 2002 → Oct 2004
- 5Celero Energy, L.P.Nov 2004 → Sep 2005
- 6Whiting Oil and Gas CorporationOct 2005 → Jun 2006
- 7Endeavor Energy Resources L.P.Jul 2006 → Jul 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 417078-99 | Reenter | Denbury Management, Inc. | Oct 14, 1993 | Oct 14, 1993 | Oct 25, 1993 | 12,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-147531 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,990 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,598 | 3,720 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 375 | 17.5 | 300 S |
| 9.625 | 590 | 12.25 | 2,530 S |
| 5.5 | 3,819 | 8.5 | 960 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 19, 1994 | Dec 15, 1993 | Yes |
| 00 | Jan 3, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-07122 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-07122 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13507122, documented in the API reference.