WELL · 42-135-20515 · DISTRICT 8

Ector AR Fee #6

Plugged

Ector County · Penwell (Queen) field  · Vertical

Ector AR Fee #6 (API 42-135-20515) is a plugged well in Ector County, plugged July 31, 2023, last operated by Pen-Tex Production CO. Inc..

The RRC has issued one drilling permit, issued May 15, 1997, permitted to 3,920 ft.

It was permitted by Pen-Tex Production CO. L.L.C. and has since transferred to Pen-Tex Production CO. Inc. on the wellbore schedule.

Completion filings report one formation top, including Queen.

Its 2 leases have reported 115K barrels of oil and 205K mcf of gas since January 1993, last reporting in July 2026. The leases carry 19 wells, so these are lease totals, not this well alone.

Operator of record

Pen-Tex Production Co. Inc.

Permitted by Pen-Tex Production Co. L.L.C.; the EWA schedule now lists a different operator.

Penwell, TX · P-5 Y, filed Sep 4, 2025 · (432) 557-7070

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePen-Tex Production Co. Inc.
Production reportsPen-Tex Production Co. Inc.through Apr 2026
Latest permitPen-Tex Production Co. L.L.C.May 15, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,920
total depth, ft
1
permits on file
May 15, 1997
last permit issued
Jul 9, 1997
completed
115K
cumulative oil, bbl
205K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 9, 1997
Shut in
—
Plugged
Jul 31, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ector -AR- Fee O-10-18196HarperPen-Tex Production Co. Inc.18115K81.9KJan 1993 – Jul 2026
Ector "AR" Fee G-10-163941Penwell (Queen)Pen-Tex Production Co. Inc.10124KJul 1997 – Jul 2023

Oil, barrels lease total

Last 12 months 1,814 · prior 12 2,017(-10%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 815 · prior 12 950(-14%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Jan 1995
  2. 2Pen-Tex Production Co. L.L.C.Feb 1995 → Nov 1998
  3. 3Pen-Tex Production Co. Inc.Dec 1998 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
462166-99RecompletionPen-Tex Production Co. L.L.C.May 8, 1997May 15, 1997Jun 6, 19973,920

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-163941————
—— O-10-18196————

Formation tops

As filed on W-2/G-1. Subsea from 3,085 ft elevation.Download CSV →

FormationMD ftSubsea
Queen3,772-687

Perforations

Perforated and open-hole intervals.

FromToType
3,8013,811Perforated
—4,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7.625312——
7.6253329.875200 S
1.53,954——
3.54,294——
3.54,3056.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 25, 1997Aug 7, 1997Yes
00Aug 15, 1997——
00Jan 12, 1984Jun 5, 1964—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13520515, documented in the API reference.