WELL · 42-135-33933 · DISTRICT 8

Tahoe-Johnson #1

Plugged

Ector County · Johnson field  · Vertical

Tahoe-Johnson #1 (API 42-135-33933) is a plugged well in Ector County, plugged February 3, 2015, last operated by Southwest-Operating.

The RRC has issued one drilling permit, issued April 7, 1982, permitted to 4,500 ft.

It was permitted by Tahoe Oil & Cattle CO. and has since transferred to Southwest-Operating on the wellbore schedule.

Its lease has reported 2.02K barrels of oil and 13.5K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Southwest-Operating

Permitted by Tahoe Oil & Cattle Co.; the EWA schedule now lists a different operator.

Penwell, TX · P-5 Y, filed May 8, 2015 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSouthwest-Operating
Production reportsSouthwest-Operatingthrough Nov 1999
Latest permitTahoe Oil & Cattle Co.Apr 7, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Apr 7, 1982
last permit issued
May 20, 1982
completed
2.02K
cumulative oil, bbl
13.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 1982
Shut in
—
Plugged
Feb 3, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tahoe-Johnson O-10-27420JohnsonSouthwest-Operating12.02K13.5KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southwest-OperatingFeb 1995 → Nov 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
156483-99DrillTahoe Oil & Cattle Co.Apr 7, 1982Apr 7, 1982—4,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-27420————

Perforations

Perforated and open-hole intervals.

FromToType
4,3084,314Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529112.25175 S
2.3754,304——
4.54,3227.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 21, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13533933, documented in the API reference.