WELL · 42-135-35030 · DISTRICT 10

Andi-Holly-Ratliff SWD #1

WaterPlugged

Ector County  · Vertical

Andi-Holly-Ratliff Swd #1 (API 42-135-35030) is a plugged well in Ector County, plugged April 19, 2013, last operated by Ex3 Systems, LLC.

The RRC has issued 2 drilling permits between 1985 and 2013, permitted to 11,200 ft.

Operator of record

EX3 Systems, LLC

Odessa, TX · P-5 Y, filed Feb 6, 2015 · 1 permits on file · (432) 416-5430

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitEX3 Systems, LLCMar 27, 2013
11,200
total depth, ft
2
permits on file
Mar 27, 2013
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 19, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
759172-99ReenterEX3 Systems, LLCMar 21, 2013Mar 27, 2013Apr 12, 201311,200
280588-99DrillHolt, Robert B.Jul 12, 1985Jul 12, 1985—11,200

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105810H-1 InjectionPlugged Apr 19, 201325,0001,8503,700–5,200

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13535030, documented in the API reference.