WELL · 42-135-35401 · DISTRICT 8
Texaco-Slator -22- #1
Ector County · Goldsmith (5600) field · Vertical
Texaco-Slator -22- #1 (API 42-135-35401) is a plugged well in Ector County, plugged May 18, 2011, last operated by Rust Oil Corp..
The RRC has issued one drilling permit, issued February 12, 1987, permitted to 8,500 ft.
Completion filings report 2 formation tops, including San Andres, Clear Fork.
Its 2 leases have reported 30.2K barrels of oil and 23.9K mcf of gas since January 1993, last reporting in October 2012. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Fort Worth, TX · P-5 X, filed Nov 17, 2025 · 317 permits on file · (817) 732-9383
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rust Oil Corp. |
| Production reports | Rust Oil Corp.through Apr 2010 |
| Latest permit | Rust Oil Corp.Feb 12, 1987 |
- 8,500
- total depth, ft
- 1
- permits on file
- Feb 12, 1987
- last permit issued
- Mar 20, 1987
- completed
- 30.2K
- cumulative oil, bbl
- 23.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 20, 1987
- Shut in
- —
- Plugged
- May 18, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Texaco-Slator -22- O-10-38085 | Goldsmith (Clear Fork) | Rust Oil Corp. | 1 | 2.67K | 0 | Nov 2006 – Oct 2012 |
| Texaco-Slator -22- O-10-31158 | Goldsmith (5600) | Rust Oil Corp. | 2 | 27.5K | 23.9K | Jan 1993 – Apr 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rust Oil Corp.Jan 1993 → Apr 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 326536-99 | Drill | Rust Oil Corp. | Feb 12, 1987 | Feb 12, 1987 | Feb 16, 1987 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-31158 | — | — | — | — |
| — | — O-10-38085 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,256 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,297 | -1,041 |
| Clear ForkCLEARFORK | 5,738 | -2,482 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,848 | 5,898 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,594 | 12.25 | 600 S |
| 5.5 | 6,555 | 7.875 | 2,225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 2007 | Apr 3, 1987 | Yes |
| 00 | Apr 13, 1987 | Apr 3, 1987 | Yes |
| 00 | Apr 7, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-35401 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-35401 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13535401, documented in the API reference.