WELL · 42-135-36222 · DISTRICT 8

Jennifer (Queen)unit #18WI

Plugged

Ector County · Concho Bluff North(queen) field  · Vertical

Jennifer (Queen)Unit #18WI (API 42-135-36222) is a plugged well in Ector County, plugged June 18, 1990, last operated by Rendova Oil CO..

The RRC has issued one drilling permit, issued April 9, 1990, permitted to 4,700 ft.

It was permitted by Rendova Oil CO and has since transferred to Rendova Oil CO. on the wellbore schedule.

Operator of record

Rendova Oil Co.

Permitted by Rendova Oil Co; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRendova Oil CoApr 9, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,700
total depth, ft
1
permits on file
Apr 9, 1990
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 18, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
371856-99DrillRendova Oil CoApr 5, 1990Apr 9, 1990Jun 12, 19904,700

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000073319H-1 InjectionPlugged Jul 5, 19904602,2004,500–4,570

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13536222, documented in the API reference.