WELL · 42-135-36816 · DISTRICT 8
Moss, William #1
Ector County · Vertical
Moss, William #1 (API 42-135-36816) is a plugged well in Ector County, plugged May 1, 1994, last operated by Paladin Energy Corp..
The RRC has issued 2 drilling permits (amended twice) between 1993 and 2006, permitted to 14,300 ft.
Completion filings report 4 formation tops, including Barnett, Moss Sand, Woodford, Devonain.
Its lease has reported 20.5K barrels of oil and 23.3K mcf of gas since February 2007, last reporting in July 2026.
Operator of record
Dallas, TX · P-5 Y, filed Feb 2, 2018 · 8 permits on file · (214) 500-4967
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Arrington Oil&gas Operating LLCthrough Mar 2026 |
| Latest permit | Paladin Energy Corp.Oct 12, 2006 |
- 14,300
- total depth, ft
- 4
- permits on file
- Oct 12, 2006
- last permit issued
- —
- completed
- 20.5K
- cumulative oil, bbl
- 23.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- May 1, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moss, William O-10-38644 | Cowden, South (Dev.) | Arrington Oil&gas Operating LLC | 1 | 20.5K | 23.3K | Feb 2007 – Jul 2026 |
Oil, barrels lease total
Last 12 months 341 · prior 12 787(-57%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Paladin Energy Corp.Feb 2007 → Jul 2010
- 2Cuervo, Inc.Aug 2010 → Nov 2010
- 3Baker Operating, Inc.Dec 2010 → Aug 2025
- 4Arrington Oil&gas Operating LLCSep 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 627418-98 | Reenter | Paladin Energy Corp. | Feb 1, 2008 | Oct 12, 2006 | Nov 2, 2006 | 12,000 |
| 627418-99 | Reenter | Paladin Energy Corp | Oct 12, 2006 | Oct 12, 2006 | — | 12,000 |
| 415574-98 | Drill | Cox, John L. | Apr 1, 1994 | Sep 3, 1993 | — | 14,300 |
| 415574-99 | Drill | Great Western Drlg. Co. | Sep 1, 1993 | Sep 3, 1993 | Oct 23, 1993 | 14,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-38644 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,911 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,410 | 11,438 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 349 | 17.5 | 325 S |
| 9.625 | 6,202 | 12.25 | 2,540 S |
| 5.5 | 11,797 | 8.5 | 940 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 19, 2008 | Feb 20, 2007 | Yes |
| 00 | Jun 6, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-36816 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-36816 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13536816, documented in the API reference.