WELL · 42-135-36869 · DISTRICT 8

Goldsmith-Landreth (Deep) Unit #1WS

Plugged

Ector County · Goldsmith (Santa Rosa) field  · Vertical

Goldsmith-Landreth (Deep) Unit #1WS (API 42-135-36869) is a plugged well in Ector County, plugged September 9, 1996, last operated by Amoco Production Company.

The RRC has issued one drilling permit (amended twice), issued November 9, 1993, permitted to 1,300 ft.

Operator of record

Amoco Production Company

Houston, TX · P-5 Y, filed May 7, 2004 · 7,201 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmoco Production Company
Production reportsAmoco Production Companythrough Aug 1995
Latest permitAmoco Production CompanyNov 9, 1993
1,300
total depth, ft
3
permits on file
Nov 9, 1993
last permit issued
Feb 8, 1994
completed
0
cumulative oil, bbl
45.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Sep 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 8, 1994
Shut in
—
Plugged
Sep 9, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith-Landreth (Deep) Unit G-10-153446Goldsmith (Santa Rosa)Amoco Production Company1045.8KFeb 1994 – Sep 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyFeb 1994 → Aug 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
418083-96DrillAmoco Production CompanyDec 9, 1994Nov 9, 1993Jan 10, 19941,300
418083-97DrillAmoco Production CompanyJul 1, 1994Nov 9, 1993—1,300
418083-99DrillAmoco Production CompanyNov 9, 1993Nov 9, 1993—1,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-153446————

Perforations

Perforated and open-hole intervals.

FromToType
1,0001,005Perforated
1,0001,210Perforated
1,0151,030Perforated
1,0351,050Perforated
1,0601,105Perforated
1,1101,130Perforated
1,1451,210Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7518014.5130 S
71,2508.75245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 5, 1996Jan 2, 1996—
00Apr 21, 1995Nov 22, 1994Yes
00Mar 31, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13536869, documented in the API reference.