WELL · 42-135-37173 · DISTRICT 8
McKenzie #2
Ector County · Penwell (Queen) field · Temp Abandoned · Vertical
Mckenzie #2 (API 42-135-37173) is a well in Ector County operated by North Lake Resources LLC, completed April 17, 1996 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued March 21, 1996, permitted to 3,650 ft.
It was permitted by Arco Permian and has since transferred to North Lake Resources LLC on the wellbore schedule.
Completion filings report one formation top, including Yates.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Arco Permian; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Mar 4, 2026 · (405) 934-1010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Lake Resources LLC |
| Production reports | Home Petroleum Corp.through Apr 2022 |
| Latest permit | Arco PermianMar 21, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,650
- total depth, ft
- 1
- permits on file
- Mar 21, 1996
- last permit issued
- Apr 17, 1996
- completed
- 0
- cumulative oil, bbl
- 462K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 17, 1996
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: R
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McKenzie G-10-158528 | Penwell (Queen) | North Lake Resources LLC | 1 | 0 | 462K | Apr 1996 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arco PermianApr 1996 → Dec 2001
- 2BP America Production CompanyJan 2002 → Nov 2007
- 3Fortune Resources LLCDec 2007 → Nov 2014
- 4Home Petroleum Corp.Dec 2014 → Apr 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 446137-99 | Drill | Arco Permian | Mar 21, 1996 | Mar 21, 1996 | Mar 28, 1996 | 3,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-158528 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,949 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,400 | 549 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,476 | 3,498 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 850 | 12.25 | 500 S |
| 5.5 | 3,575 | 7.875 | 1,150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 8, 1996 | Apr 25, 1996 | Yes |
| 00 | Jun 28, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-37173 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-37173 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13537173, documented in the API reference.