WELL · 42-135-42273 · DISTRICT 8
Millard -B- #25
Ector County · Vertical
Millard -B- #25 (API 42-135-42273) is a permitted well in Ector County filed by Ring Energy, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 2013 and 2026, permitted to 9,300 ft.
Completion filings report 4 formation tops, including Clear Fork, Devonian, Waddell, Ellenburger.
Its lease has reported 85.9K barrels of oil and 213K mcf of gas since June 2013, last reporting in July 2026.
Operator of record
Midland, TX · P-5 Y, filed Nov 4, 2025 · 997 permits on file · (855) 214-5188
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Ring Energy, Inc.through Apr 2026 |
| Latest permit | Ring Energy, Inc.Jun 17, 2026 |
- 9,300
- total depth, ft
- 3
- permits on file
- Jun 17, 2026
- last permit issued
- —
- completed
- 85.9K
- cumulative oil, bbl
- 213K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Millard -B- O-10-44923 | Penwell (Devonian) | Ring Energy, Inc. | 1 | 85.9K | 213K | Jun 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 4,533 · prior 12 3,518(+29%)
Gas, mcf lease total
Last 12 months 15,344 · prior 12 13,866(+11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conocophillips CompanyJun 2013 → Feb 2019
- 2Founders Oil & Gas Operating,llcMar 2019 → Jul 2023
- 3Ring Energy, Inc.Aug 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 916439-99 | Recompletion | Ring Energy, Inc. | Jun 15, 2026 | Jun 17, 2026 | — | 8,747 |
| 755315-98 | Drill | Conocophillips Company | Apr 29, 2013 | Mar 25, 2013 | Apr 28, 2013 | 9,300 |
| 755315-99 | Drill | Conocophillips Company | Jan 23, 2013 | Mar 25, 2013 | Apr 28, 2013 | 9,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-44923 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,908 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear Fork | 4,070 | -1,162 |
| Devonian | 7,040 | -4,132 |
| Waddell | 8,328 | -5,420 |
| Ellenburger | 8,565 | -5,657 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,050 | 7,090 | Perforated |
| 7,390 | 7,409 | Perforated |
| 8,370 | 8,397 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 976 | 12.25 | 700 S |
| 5.5 | 8,737 | 7.875 | 1,900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 14, 2014 | Aug 12, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-42273 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-42273 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13542273, documented in the API reference.