WELL · 42-137-31944 · DISTRICT 1
Bowermaster 46 #4606
Edwards County · Hackberry Creek (Canyon) field · Directional
Bowermaster 46 #4606 (API 42-137-31944) is a plugged well in Edwards County, plugged January 15, 2020, last operated by Muskegon Development Company.
The RRC has issued one drilling permit (amended twice), issued January 30, 2008, permitted to 4,000 ft.
It was permitted by Diamondback Operating, LP and has since transferred to Muskegon Development Company on the wellbore schedule.
Operator of record
Permitted by Diamondback Operating, LP; the EWA schedule now lists a different operator.
MT Pleasant, MI · P-5 Y, filed Feb 7, 2020 · 17 permits on file · (989) 772-4900
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Muskegon Development Company |
| Production reports | Muskegon Development Companythrough May 2019 |
| Latest permit | Diamondback Operating, LPJan 30, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 3
- permits on file
- Jan 30, 2008
- last permit issued
- May 10, 2008
- completed
- 0
- cumulative oil, bbl
- 228K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2008 THROUGH Jan 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 10, 2008
- Shut in
- —
- Plugged
- Jan 15, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bowermaster "46" G-1-243034 | Hackberry Creek (Canyon) | Muskegon Development Company | 1 | 0 | 228K | May 2008 – Jan 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Diamondback Operating, LPMay 2008 → Dec 2011
- 2Muskegon Development CompanyJun 2012 → May 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 653509-97 | Drill | Diamondback Operating, LP | Jun 16, 2008 | Jan 30, 2008 | May 10, 2008 | 4,000 |
| 653509-98 | Drill | Diamondback Operating, LP | Feb 29, 2008 | Jan 30, 2008 | — | 4,000 |
| 653509-99 | Drill | Diamondback Operating, LP | Jan 18, 2008 | Jan 30, 2008 | Mar 24, 2008 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-243034 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,700 | 2,750 | Perforated |
| 2,723 | 2,734 | Perforated |
| 2,723 | 2,744 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 1,228 | — | 94 S |
| 7 | 1,234 | 9.875 | 200 S |
| 4.5 | 2,718 | 6.25 | 295 S |
| 9.5 | 2,721 | 6.25 | 65 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 22, 2009 | Jun 8, 2009 | Yes |
| 00 | Jul 23, 2009 | Jun 3, 2008 | — |
| 00 | Dec 15, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-137-31944 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-137-31944 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13731944, documented in the API reference.