WELL · 42-143-30636 · DISTRICT 7
Waynick #1
Erath County · Newark East (Barnett Shale) field · Vertical
Waynick #1 (API 42-143-30636) is a plugged well in Erath County, plugged September 17, 2010, last operated by Cumming Company Inc. The.
The RRC has issued 2 drilling permits between 1980 and 2008, permitted to 4,500 ft.
Completion filings report 3 formation tops, including Marble Falls, Conglomerate, Barnett.
Operator of record
Fort Worth, TX · P-5 Y, filed Jan 4, 2026 · 410 permits on file · (817) 475-0166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cumming Company Inc. The |
| Production reports | Cumming Company, Inc. Thethrough Sep 2010 |
| Latest permit | Cumming Company, Inc. TheJun 28, 2008 |
- 4,500
- total depth, ft
- 2
- permits on file
- Jun 28, 2008
- last permit issued
- Jul 2, 2008
- completed
- 0
- cumulative oil, bbl
- 200K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 2, 2008
- Shut in
- —
- Plugged
- Sep 17, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Waynick G-13-242806 | Newark, East (Barnett Shale) | Cumming Company, Inc. The | 1 | 0 | 88.4K | Jul 2008 – Jan 2018 |
| Waynick G-8-88146 | Indianola (Marble Falls) | Cumming Company, Inc. The | 1 | 0 | 112K | Jan 1993 – Jul 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sun-Key Oil Co., Inc.Jan 1993 → Apr 2008
- 2Cumming Company, Inc. TheJun 2008 → Sep 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 664281-99 | Recompletion | Cumming Company, Inc. The | Jun 11, 2008 | Jun 28, 2008 | Jun 6, 2008 | 3,800 |
| 77598-99 | Drill | Christie Energy Co., Inc. | Apr 8, 1980 | Apr 8, 1980 | Apr 19, 1980 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-88146 | — | — | — | — |
| — | — G-13-242806 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,245 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 3,190 | -1,945 |
| Conglomerate | 3,258 | -2,013 |
| BarnettBARNETT SHALE | 3,750 | -2,505 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,258 | 3,288 | Perforated |
| 3,762 | 3,788 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 715 | 12.25 | 480 S |
| 3.25 | 3,286 | — | — |
| 4.5 | 3,800 | 7.875 | 330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 24, 2009 | Oct 17, 2008 | Yes |
| 00 | Dec 9, 2008 | — | — |
| 00 | Jan 12, 1984 | Jun 2, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-30636 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-30636 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14330636, documented in the API reference.