WELL · 42-143-30958 · DISTRICT 7
Whitis Gas Unit #1 #1
Erath County · X-Ray S.(marble Falls) field · Vertical
Whitis Gas Unit #1 #1 (API 42-143-30958) is a plugged well in Erath County, plugged January 30, 2020, last operated by Pryor Petroleum Corporation.
The RRC has issued one drilling permit, issued November 17, 1994, permitted to 3,800 ft.
It was permitted by Principal Oil Corp. and has since transferred to Pryor Petroleum Corporation on the wellbore schedule.
Completion filings report one formation top, including Marble Falls.
Operator of record
Permitted by Principal Oil Corp.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Mar 4, 2026 · 32 permits on file · (940) 733-3721
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pryor Petroleum Corporation |
| Production reports | Pryor Petroleum Corporationthrough Aug 2005 |
| Latest permit | Principal Oil Corp.Nov 17, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 1
- permits on file
- Nov 17, 1994
- last permit issued
- Dec 29, 1994
- completed
- 0
- cumulative oil, bbl
- 266K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jan 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 29, 1994
- Shut in
- —
- Plugged
- Jan 30, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Whitis Gas Unit #1 G-8-152849 | X-Ray S.(marble Falls) | Pryor Petroleum Corporation | 1 | 0 | 266K | Dec 1994 – Jan 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Principal Oil Corp.Jul 1995 → Jun 1998
- 2Talon Production, Inc.May 2000 → Apr 2001
- 3Pryor Petroleum CorporationMay 2001 → Aug 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430150-99 | Drill | Principal Oil Corp. | Nov 17, 1994 | Nov 17, 1994 | Nov 30, 1994 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-152849 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,509 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble FallsMARBLE FALLS LIME | 3,512 | -2,003 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,562 | 3,564 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 528 | 12.25 | 325 S |
| 4.5 | 3,648 | 78 | 14,007 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 19, 1995 | Jan 25, 1995 | Yes |
| 00 | Feb 28, 1995 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-30958 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-30958 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14330958, documented in the API reference.