WELL · 42-143-31002 · DISTRICT 7
DMV - Parker #1
Erath County · Desdemona E. (Marble Falls) field · Vertical
Dmv - Parker #1 (API 42-143-31002) is a plugged well in Erath County, plugged October 3, 2024, last operated by Dmv Pipeline LLC.
The RRC has issued one drilling permit (amended once), issued August 11, 1999, permitted to 3,999 ft.
It was permitted by Lockout Corporation and has since transferred to Dmv Pipeline LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Marble Falls, Duffer.
Operator of record
Permitted by Lockout Corporation; the EWA schedule now lists a different operator.
Lipan, TX · P-5 Y, filed Feb 4, 2026 · (817) 312-2940
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | DMV Pipeline LLC |
| Production reports | DMV Pipeline LLCthrough Nov 2018 |
| Latest permit | Lockout CorporationAug 11, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,999
- total depth, ft
- 2
- permits on file
- Aug 11, 1999
- last permit issued
- Aug 28, 1999
- completed
- 0
- cumulative oil, bbl
- 264K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Oct 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 28, 1999
- Shut in
- —
- Plugged
- Oct 3, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| DMV - Parker G-8-174469 | Desdemona, E. (Marble Falls) | DMV Pipeline LLC | 1 | 0 | 264K | Aug 1999 – Oct 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lockout CorporationAug 1999 → Dec 2005
- 2DMV Pipeline LLCJan 2006 → Nov 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 486595-98 | Drill | Lockout Corporation | Sep 14, 1999 | Aug 11, 1999 | Aug 11, 1999 | 3,999 |
| 486595-99 | Drill | Lockout Corporation | Aug 11, 1999 | Aug 11, 1999 | — | 3,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-174469 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,302 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 2,050 | -748 |
| Marble Falls | 2,752 | -1,450 |
| Duffer | 3,250 | -1,948 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,752 | 2,824 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 162 | 12.25 | 100 S |
| 5.5 | 3,125 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 20, 1999 | Sep 16, 1999 | Yes |
| 00 | Oct 15, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-31002 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-31002 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14331002, documented in the API reference.