WELL · 42-143-31050 · DISTRICT 9

Taylor #1

Y

Erath County · Newark East (Barnett Shale) field · Injection  · Vertical

Taylor #1 (API 42-143-31050) is a well in Erath County operated by Winslow Operating Company LLC, completed November 15, 2005 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 3, 2005, permitted to 6,300 ft.

It was permitted by Infinity Oil & Gas Of TX, Inc. and has since transferred to Winslow Operating Company LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Marble Falls, Duffer, Barnett, Ellenburger.

No lease production has been reported under this well’s leases.

Operator of record

Winslow Operating Company LLC

Permitted by Infinity Oil & Gas of TX, Inc.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Mar 4, 2026 · (512) 870-9003

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWinslow Operating Company LLC
Production reportsnone
Latest permitInfinity Oil & Gas of TX, Inc.May 3, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
May 3, 2005
last permit issued
Nov 15, 2005
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 15, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Taylor O-13-30557Newark, East (Barnett Shale)Winslow Operating Company, LLC100Dec 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
561260-99DrillInfinity Oil & Gas of TX, Inc.Apr 29, 2005May 3, 2005Nov 15, 20056,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30557————

Formation tops

As filed on W-2/G-1. Subsea from 1,222 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls3,722-2,500
Duffer3,852-2,630
Barnett4,145-2,923
BarnettBARNETT SHALE4,145-2,923
EllenburgerELLENBERGER4,290-3,068
Ellenburger4,290-3,068
Hickory6,150-4,928

Perforations

Perforated and open-hole intervals.

FromToType
5,8665,922Perforated
5,8665,938Perforated
5,9345,938Perforated
6,0646,107Perforated
6,0646,248Perforated
6,1126,115Perforated
6,1226,128Perforated
6,1386,140Perforated
6,1426,174Perforated
6,1836,187Perforated
6,2066,220Perforated
6,2316,248Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62552512.25250 S
76,3128.75805 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 2015May 18, 2015—
00Jul 5, 2006Jan 10, 2006—
00Feb 27, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

16.8K
bbl, last 12 reported months
2.14M
bbl, all reported
Sep 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095313W-14 DisposalCanceled Dec 15, 202210,0002,9005,800–6,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 16,755 · prior 12 16,892(-1%)

02K4K20152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14331050, documented in the API reference.