WELL · 42-143-31058 · DISTRICT 9
Smith #2H
Erath County · Newark East (Barnett Shale) field · Horizontal
Smith #2H (API 42-143-31058) is a plugged horizontal well in Erath County, plugged May 24, 2018, last operated by Infinity Oil & Gas Of TX Inc..
The RRC has issued one drilling permit (amended once), issued May 26, 2005, permitted to 4,200 ft.
Completion filings report 3 formation tops, including Marble Falls, Duffer, Barnett.
Operator of record
Overland Park, KS · P-5 Y, filed May 4, 2026 · 89 permits on file · (913) 338-4455
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Infinity Oil & Gas of TX Inc. |
| Production reports | Infinity Oil & Gas of TX, Inc.through Aug 2006 |
| Latest permit | Infinity Oil & Gas of TX, Inc.May 26, 2005 |
- 4,200
- total depth, ft
- 2
- permits on file
- May 26, 2005
- last permit issued
- Mar 3, 2006
- completed
- 0
- cumulative oil, bbl
- 5.81K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH May 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 3, 2006
- Shut in
- —
- Plugged
- May 24, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smith G-13-220015 | Newark, East (Barnett Shale) | Infinity Oil & Gas of TX, Inc. | 1 | 0 | 5.81K | Mar 2006 – May 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Infinity Oil & Gas of TX, Inc.Mar 2006 → Aug 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 601256-98 | Drill | Infinity Oil & Gas of TX, Inc. | Nov 22, 2005 | May 26, 2005 | Jan 25, 2006 | 4,200 |
| 601256-99 | Drill | Infinity Oil & Gas of TX, Inc. | May 26, 2005 | May 26, 2005 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-220015 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,298 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 3,814 | -2,516 |
| Duffer | 3,924 | -2,626 |
| BarnettBARNETT SHALE | 4,007 | -2,709 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,572 | 4,582 | Perforated |
| 4,833 | 5,959 | Perforated |
| 5,095 | 5,105 | Perforated |
| 5,388 | 5,398 | Perforated |
| 5,522 | 5,532 | Perforated |
| 5,688 | 5,698 | Perforated |
| 6,178 | 6,188 | Perforated |
| 6,472 | 6,482 | Perforated |
| 6,765 | 6,775 | Perforated |
| 6,993 | 7,003 | Perforated |
| 7,285 | 7,295 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 504 | 12.25 | 250 S |
| 5.5 | 4,350 | 8.75 | 1,275 S |
| 3.5 | 7,400 | 8.75 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 19, 2007 | May 30, 2006 | Yes |
| 00 | Oct 11, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-31058 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-31058 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14331058, documented in the API reference.