WELL · 42-143-31141 · DISTRICT 7

Allen #1H

Plugged

Erath County · Newark East (Barnett Shale) field  · Horizontal · Directional

Allen #1H (API 42-143-31141) is a plugged horizontal well in Erath County, plugged December 30, 2011, last operated by Rimrock Energy LLC.

The RRC has issued 3 drilling permits (amended twice) between 2006 and 2010, permitted to 7,110 ft.

Completion filings report 4 formation tops, including Strawn, Marble Falls, Marble Falsl, Barnett.

Its 3 leases have reported 60 barrels of oil and 20.6K mcf of gas since August 2006, last reporting in December 2011. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Rimrock Energy LLC

Fort Worth, TX · P-5 Y, filed Jun 7, 2013 · 115 permits on file · (214) 649-5037

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRimrock Energy LLC
Production reportsRimrock Energy, LLCthrough Mar 2011
Latest permitRimrock Energy, LLCApr 9, 2010
7,110
total depth, ft
5
permits on file
Apr 9, 2010
last permit issued
Jan 18, 2009
completed
60
cumulative oil, bbl
20.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Dec 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 18, 2009
Shut in
—
Plugged
Dec 30, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Allen G-8-256144Laney, NE (Strawn 2700)Rimrock Energy, LLC1020.6KAug 2009 – Dec 2011
Allen O-13-31512Newark, East (Barnett Shale)Rimrock Energy, LLC1600Jan 2009 – Jun 2010
Allen G-13-238345Newark, East (Barnett Shale)Rimrock Energy, LLC100Aug 2006 – Feb 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rimrock Energy, LLCApr 2009 → Mar 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
693824-99RecompletionRimrock Energy, LLCApr 1, 2010Apr 9, 2010Aug 17, 20094,721
672630-97RecompletionRimrock Energy, LLCDec 28, 2009Nov 18, 2008Jul 11, 20087,110
672630-98RecompletionRimrock Energy, LLCNov 13, 2008Oct 15, 2008—7,110
672630-99RecompletionRimrock Energy, LLCOct 7, 2008Oct 15, 2008—7,110
620513-99DrillDenbury Onshore, LLCJun 6, 2006Jun 8, 2006Jun 24, 20067,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-256144————
—— G-13-238345————
—— O-13-31512————

Formation tops

As filed on W-2/G-1. Subsea from 1,127 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn1,882-755
Marble Falls4,353-3,226
Marble Falsl4,353-3,226
Marble Falls4,385-3,258
Barnett4,886-3,759
BarnettBARNETT SHALE4,886-3,759

Perforations

Perforated and open-hole intervals.

FromToType
3,5843,590Perforated
3,6173,622Perforated
5,0855,286Perforated
5,3605,661Perforated
5,8006,051Perforated
6,1756,371Perforated
6,4556,701Perforated
6,8697,025Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62554912.25260 S
5.57,1098.751,080 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 22, 2010Apr 12, 2010Yes
00Jun 11, 2010——
00May 26, 2010Jun 24, 2009Yes
00Apr 5, 2010Apr 27, 2009Yes
00Feb 25, 2010——
00Sep 4, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14331141, documented in the API reference.