WELL · 42-143-31203 · DISTRICT 13

Golightly #1SD

N

Erath County  · Vertical

Golightly #1SD (API 42-143-31203) is a former disposal or injection well in Erath County, last operated by Infinity Oil & Gas Of TX, Inc.; its UIC permit is no longer active.

The RRC has issued one drilling permit (amended once), issued February 6, 2007, permitted to 7,000 ft.

Operator of record

Infinity Oil & Gas of TX, Inc.

Overland Park, KS · P-5 Y, filed May 4, 2026 · 89 permits on file · (913) 338-4455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitInfinity Oil & Gas of TX, Inc.Feb 6, 2007
7,000
total depth, ft
2
permits on file
Feb 6, 2007
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
632899-98DrillInfinity Oil & Gas of TX, Inc.Feb 28, 2007Feb 6, 2007—7,000
632899-99DrillInfinity Oil & Gas of TX, Inc.Feb 1, 2007Feb 6, 2007—7,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Sep 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000098579W-14 DisposalCanceled Jan 9, 201310,0003,0006,500–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14331203, documented in the API reference.