WELL · 42-143-31376 · DISTRICT 9

Shoebar Ranch #L 2H

Plugged

Erath County · Newark East (Barnett Shale) field  · Horizontal

Shoebar Ranch #L 2H (API 42-143-31376) is a plugged horizontal well in Erath County, plugged April 4, 2024, last operated by Xto Energy Inc..

The RRC has issued one drilling permit (amended once), issued October 22, 2008, permitted to 12,500 ft.

Completion filings report 3 formation tops, including Smithwick, Bend, Barnett.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Jun 2023
Latest permitXTO Energy Inc.Mar 12, 2009
12,500
total depth, ft
2
permits on file
Mar 12, 2009
last permit issued
Mar 3, 2010
completed
0
cumulative oil, bbl
493K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Apr 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 3, 2010
Shut in
—
Plugged
Apr 4, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shoebar Ranch G-13-250677Newark, East (Barnett Shale)XTO Energy Inc.10493KJan 2009 – Apr 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Mar 2010 → Jun 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
673329-98DrillXTO Energy Inc.Mar 10, 2009Mar 12, 2009Jan 10, 200912,500
673329-99DrillXTO Energy Inc.Oct 16, 2008Oct 22, 2008—12,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-250677————

Formation tops

As filed on W-2/G-1. Subsea from 1,178 ft elevation.Download CSV →

FormationMD ftSubsea
Smithwick4,448-3,270
Bend4,533-3,355
Barnett5,047-3,869

Perforations

Perforated and open-hole intervals.

FromToType
7,7588,137Perforated
7,7589,141Perforated
8,2598,640Perforated
8,7609,141Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62559812.25210 S
5.59,2078.751,245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 2010Mar 30, 2010—
00Oct 8, 2009Apr 15, 2009Yes
00Sep 3, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14331376, documented in the API reference.