WELL · 42-143-31406 · DISTRICT 9
McBroom #1
Erath County · Newark East (Barnett Shale) field · Temp Abandoned · Vertical
Mcbroom #1 (API 42-143-31406) is a well in Erath County operated by Quest-Tex Energy OP II LLC, completed July 20, 2011 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued June 16, 2011, permitted to 4,500 ft.
It was permitted by Cumming Company, Inc. The and has since transferred to Quest-Tex Energy OP II LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Conglomerate, Marble Falls, Barnett.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Cumming Company, Inc. The; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Feb 4, 2026 · (214) 226-2606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quest-Tex Energy OP II LLC |
| Production reports | Cumming Company, Inc. Thethrough Apr 2014 |
| Latest permit | Cumming Company, Inc. TheJun 16, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Jun 16, 2011
- last permit issued
- Jul 20, 2011
- completed
- 0
- cumulative oil, bbl
- 41.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 20, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McBroom G-13-263344 | Newark, East (Barnett Shale) | Quest-Tex Energy OP II, LLC | 1 | 0 | 41.7K | Jul 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cumming Company, Inc. TheJul 2011 → Apr 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 718173-99 | Drill | Cumming Company, Inc. The | Jun 10, 2011 | Jun 16, 2011 | Jun 30, 2011 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-263344 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,311 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Conglomerate | 3,240 | -1,929 |
| Marble Falls | 3,558 | -2,247 |
| BarnettBARNETT SHALE | 3,787 | -2,476 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,816 | 3,840 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 422 | 12.25 | 300 S |
| 4.5 | 3,890 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 2012 | Jan 4, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-143-31406 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-143-31406 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14331406, documented in the API reference.