WELL · 42-145-30780 · DISTRICT 5
Polley #1
Falls County · Satin field · Vertical
Polley #1 (API 42-145-30780) is a plugged well in Falls County, plugged October 25, 2022, last operated by Polley Gary R..
The RRC has issued one drilling permit, issued September 4, 2002, permitted to 1,500 ft.
It was permitted by K & D Enterprises, Inc. and has since transferred to Polley Gary R. on the wellbore schedule.
Completion filings report 3 formation tops, including Austin Chalk, Eagle Ford, Buda.
Its lease has reported 1.21K barrels of oil since November 2002, last reporting in July 2026.
Operator of record
Permitted by K & D Enterprises, Inc.; the EWA schedule now lists a different operator.
Bruceville, TX · P-5 Y, filed Jan 14, 2023 · (254) 857-4303
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Polley Gary R. |
| Production reports | Polley, Gary R.through Aug 2014 |
| Latest permit | K & D Enterprises, Inc.Sep 4, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,500
- total depth, ft
- 1
- permits on file
- Sep 4, 2002
- last permit issued
- Sep 29, 2002
- completed
- 1.21K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 29, 2002
- Shut in
- —
- Plugged
- Oct 25, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Polley O-5-3744 | Satin | Polley, Gary R. | 1 | 1.21K | 0 | Nov 2002 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1K & D Enterprises, Inc.Dec 2002 → Jun 2003
- 2Polley, RobertJul 2003 → Nov 2011
- 3Polley, Gary R.Aug 2012 → Aug 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 523376-99 | Drill | K & D Enterprises, Inc. | Sep 4, 2002 | Sep 4, 2002 | Sep 6, 2002 | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3744 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Austin Chalk | 526 |
| Eagle FordEAGLEFORD SHALE | 700 |
| BudaBUDA LIMESTONE | 892 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 898 | 904 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.875 | 100 | 10 | — |
| 7.625 | 100 | 10 | — |
| 4.5 | 950 | 6.75 | — |
| 4.5 | 950 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 20, 2003 | Jan 2, 2003 | — |
| 00 | Dec 10, 2002 | Nov 12, 2002 | Yes |
| 00 | Nov 21, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-145-30780 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-145-30780 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14530780, documented in the API reference.