WELL · 42-149-30586 · DISTRICT 3
Pavlica Don #1 D
Fayette County · Giddings (Austin Chalk-3) field · Vertical
Pavlica Don #1 D (API 42-149-30586) is a plugged well in Fayette County, plugged February 26, 1994, last operated by Holliday Disposals Inc..
The RRC has issued 2 drilling permits between 1980 and 1981, permitted to 7,500 ft.
It was permitted by Swd, Inc. and has since transferred to Holliday Disposals Inc. on the wellbore schedule.
Operator of record
Permitted by SWD, Inc.; the EWA schedule now lists a different operator.
Inez, TX · P-5 Y, filed Jul 7, 1995
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Holliday Disposals Inc. |
| Production reports | none |
| Latest permit | SWD, Inc.Aug 3, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,500
- total depth, ft
- 2
- permits on file
- Aug 3, 1981
- last permit issued
- Sep 5, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 5, 1981
- Shut in
- —
- Plugged
- Feb 26, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pavlica, Don O-3-13254 | Giddings (Austin Chalk-3) | Holliday Disposals, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 128300-99 | Recompletion | SWD, Inc. | Aug 3, 1981 | Aug 3, 1981 | Aug 26, 1991 | 7,500 |
| 82320-99 | Drill | Cobra Oil & Gas Corporation | May 29, 1980 | May 29, 1980 | Jun 11, 1980 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-13254 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,350 | 4,370 | Perforated |
| 4,390 | 4,410 | Perforated |
| 7,113 | 7,348 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,400 | 13.5 | 1,350 S |
| 2.375 | 7,100 | — | — |
| 4.5 | 7,602 | 8.5 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 18, 1993 | Aug 20, 1993 | — |
| 00 | Jan 12, 1984 | Aug 28, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-149-30586 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-149-30586 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 302K
- bbl, last 12 reported months
- 2.74M
- bbl, all reported
- Jan 1994
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000043982 | W-14 Disposal | Plugged Aug 22, 1994 | 2,700 | 1,000 | 4,350–4,410 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 302,146 · prior 12 710,490(-57%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14930586, documented in the API reference.