WELL · 42-149-30598 · DISTRICT 3

Johnson No. 1 Oil Unit #2

Plugged

Fayette County · Giddings (Buda) field  · Horizontal · Sidetrack

Johnson NO. 1 Oil Unit #2 (API 42-149-30598) is a plugged horizontal well in Fayette County, plugged March 11, 2010, last operated by Czar Resources Inc..

The RRC has issued 3 drilling permits between 1980 and 1991, permitted to 9,100 ft.

It was permitted by Seahawk Petroleum Corporation and has since transferred to Czar Resources Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Buda.

Its lease has reported 15.2K barrels of oil and 55.7K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Czar Resources Inc.

Permitted by Seahawk Petroleum Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Dec 4, 1992 · 44 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCzar Resources Inc.
Production reportsRathburn Land & Devel, Inc.through Jul 1997
Latest permitSeahawk Petroleum CorporationJul 30, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,100
total depth, ft
3
permits on file
Jul 30, 1991
last permit issued
Aug 21, 1980
completed
15.2K
cumulative oil, bbl
55.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 21, 1980
Shut in
—
Plugged
Mar 11, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson O-3-13566Giddings (Austin Chalk-3)Caddo Energy Co., Inc.115.2K55.7KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Seahawk Petroleum CorporationJan 1993 → May 1993
  2. 2Acock Engineering & Assoc., Inc.Jul 1993 → Jun 1994
  3. 3Rathburn Land & Devel, Inc.Jul 1995 → Jul 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
390408-99Recompletion · sidetrackSeahawk Petroleum CorporationJul 30, 1991Jul 30, 1991Aug 1, 19919,100
102712-99RecompletionCzar Resources, Inc.Dec 18, 1980Dec 18, 1980—8,500
83426-99DrillCzar Resources, Inc.Jun 5, 1980Jun 5, 1980Jul 3, 19808,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-13566————

Formation tops

As filed on W-2/G-1. Subsea from 283 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,013-6,730
Austin Chalk7,317-7,034
Eagle Ford8,000-7,717
Buda8,030-7,747

Perforations

Perforated and open-hole intervals.

FromToType
7,8557,962Perforated
7,9068,904Perforated
8,0308,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,11612.251,425 S
8.6253,116—1,425 S
2.8758,000——
5.58,0307.875430 S
5.58,030—430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 1993Feb 26, 1993Yes
00Jan 12, 1984Dec 10, 1980—
00Jan 12, 1984Sep 5, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14930598, documented in the API reference.