WELL · 42-149-31167 · DISTRICT 3
Mary Jane #1
Fayette County · Giddings (Edwards Gas) field · Vertical
Mary Jane #1 (API 42-149-31167) is a plugged well in Fayette County, plugged August 31, 2007, last operated by Heci Exploration Company.
The RRC has issued 2 drilling permits between 1981 and 1987, permitted to 12,100 ft.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.
Its lease has reported 198 barrels of oil and 992 mcf of gas since January 1993, last reporting in October 2007.
Operator of record
Giddings, TX · P-5 Y, filed Oct 9, 1991 · 86 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Heci Exploration Company |
| Production reports | Browning Oil Company, Inc.through Mar 1994 |
| Latest permit | Heci Exploration CompanyAug 31, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,100
- total depth, ft
- 2
- permits on file
- Aug 31, 1987
- last permit issued
- Nov 14, 1981
- completed
- 198
- cumulative oil, bbl
- 992
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 14, 1981
- Shut in
- —
- Plugged
- Aug 31, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mary Jane O-3-19756 | Giddings (Austin Chalk-3) | Browning Oil Company, Inc. | 1 | 198 | 992 | Jan 1993 – Oct 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Browning Oil Company, Inc.Jan 1993 → Mar 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 335100-99 | Recompletion | Heci Exploration Company | Aug 26, 1987 | Aug 31, 1987 | — | 11,720 |
| 129364-99 | Drill | Humble Exploration Co., Inc. | Aug 10, 1981 | Aug 10, 1981 | — | 12,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-19756 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 405 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 9,650 | -9,245 |
| Austin Chalk | 10,135 | -9,730 |
| Eagle FordEAGLEFORD | 10,930 | -10,525 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,689 | 10,927 | Perforated |
| 11,224 | 11,610 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,506 | 12.25 | 750 S |
| 2.375 | 11,130 | — | — |
| 5.5 | 11,720 | 8.75 | 1,110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 23, 1987 | Aug 27, 1987 | Yes |
| 00 | Sep 10, 1987 | — | — |
| 00 | Jan 12, 1984 | Dec 11, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-149-31167 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-149-31167 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14931167, documented in the API reference.