WELL · 42-149-31771 · DISTRICT 3
Geosouthern Elise #1H
Fayette County · Giddings (Austin Chalk Gas) field · Horizontal · Sidetrack
Geosouthern Elise #1H (API 42-149-31771) is a plugged horizontal well in Fayette County, plugged July 14, 2010, last operated by Chesapeake Operating Inc..
The RRC has issued 3 drilling permits (amended once) between 1984 and 1994, permitted to 12,000 ft.
Completion filings report 4 formation tops, including Navarro, Pecan Gap, Austin Chalk, Eagle Ford.
Its 2 leases have reported 3.42K barrels of oil and 248K mcf of gas since January 1993, last reporting in September 2011. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Chesapeake Operating, Inc.through Dec 2001 |
| Latest permit | Chesapeake Operating, Inc.Jun 27, 1994 |
- 12,000
- total depth, ft
- 4
- permits on file
- Jun 27, 1994
- last permit issued
- Aug 1, 1994
- completed
- 3.42K
- cumulative oil, bbl
- 248K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 1994
- Shut in
- —
- Plugged
- Jul 14, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Geosouthern Elise G-3-152612 | Giddings (Austin Chalk, Gas) | Chesapeake Operating, Inc. | 1 | 0 | 215K | Aug 1994 – Sep 2011 |
| Geosouthern-Elise O-3-17827 | Giddings (Austin Chalk-3) | Chesapeake Operating, Inc. | 2 | 3.42K | 33.2K | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Jan 1993 → Dec 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 425328-99 | Recompletion · sidetrack | Chesapeake Operating, Inc. | Jun 27, 1994 | Jun 27, 1994 | Jul 1, 1994 | 11,100 |
| 385364-98 | Recompletion · sidetrack | Parkway Petroleum, Inc. | Nov 25, 1991 | Mar 6, 1991 | Jan 5, 1992 | 12,000 |
| 385364-99 | Recompletion · sidetrack | Parkway Petroleum, Inc. | Mar 6, 1991 | Mar 6, 1991 | — | 11,150 |
| 235414-99 | Drill | Geosouthern Energy Corporation | Apr 12, 1984 | Apr 12, 1984 | Jun 23, 1984 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-152612 | — | — | — | — |
| — | — O-3-17827 | — | — | — | — |
| — | — O-3-17827 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 423 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 8,234 | -7,811 |
| Pecan Gap | 9,720 | -9,297 |
| Pecan Gap | 9,722 | -9,299 |
| Austin Chalk | 10,322 | -9,899 |
| Austin Chalk | 10,324 | -9,901 |
| Eagle FordEAGLEFORD | 11,022 | -10,599 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,390 | 13,445 | Perforated |
| 10,391 | 13,445 | Perforated |
| 10,608 | 14,297 | Perforated |
| 11,021 | 10,704 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,258 | 12.25 | 615 S |
| 5.5 | 11,140 | 8.5 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 1995 | Nov 4, 1995 | — |
| 00 | Feb 7, 1995 | — | — |
| 00 | May 5, 1993 | Aug 12, 1992 | Yes |
| 00 | Apr 29, 1993 | Aug 8, 1984 | — |
| 00 | Aug 24, 1984 | Aug 8, 1984 | — |
| 00 | Aug 18, 1984 | Aug 8, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-149-31771 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-149-31771 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14931771, documented in the API reference.