WELL · 42-149-32835 · DISTRICT 3
Lange Alfred #1
Fayette County · Giddings (Austin Chalk Gas) field · Horizontal · Sidetrack
Lange Alfred #1 (API 42-149-32835) is a plugged horizontal well in Fayette County, plugged June 20, 2019, last operated by Geosouthern Energy Corporation.
The RRC has issued 2 drilling permits between 1993 and 1998, permitted to 13,000 ft.
Completion filings report one formation top, including Austin Chalk.
Operator of record
Geosouthern Energy Corporation
The Woodlands, TX · P-5 Y, filed Feb 4, 2026 · 453 permits on file · (844) 733-6205
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Geosouthern Energy Corporation |
| Production reports | Geosouthern Energy Corporationthrough Aug 1999 |
| Latest permit | Geosouthern Energy CorporationJun 5, 1998 |
- 13,000
- total depth, ft
- 2
- permits on file
- Jun 5, 1998
- last permit issued
- Jul 24, 1998
- completed
- 0
- cumulative oil, bbl
- 87.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Jun 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 1998
- Shut in
- —
- Plugged
- Jun 20, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lange, Alfred G-3-149636 | Giddings (Austin Chalk, Gas) | Geosouthern Energy Corporation | 1 | 0 | 87.9K | Jan 1994 – Jun 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Reserve Production, Inc.Jan 1994 → Mar 1997
- 2Mineral Technologies, Inc.Apr 1997 → Apr 1998
- 3Geosouthern Energy CorporationMay 1998 → Aug 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 476794-99 | Recompletion · sidetrack | Geosouthern Energy Corporation | Jun 2, 1998 | Jun 5, 1998 | Jun 13, 1998 | 13,000 |
| 418114-99 | Drill | Reserve Production, Inc. | Nov 10, 1993 | Nov 10, 1993 | Nov 23, 1993 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-149636 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 481 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 11,510 | -11,029 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,510 | 14,801 | Perforated |
| 11,986 | 13,410 | Perforated |
| 11,986 | 14,105 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,213 | 12.25 | 900 S |
| 9.625 | 3,213 | — | 900 S |
| 7 | 11,495 | 8.75 | 335 S |
| 7 | 11,495 | — | 335 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 7, 1998 | Nov 2, 1998 | Yes |
| 00 | Jun 29, 1994 | Feb 14, 1994 | Yes |
| 00 | Jun 27, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-149-32835 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-149-32835 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/14932835, documented in the API reference.