WELL · 42-149-32866 · DISTRICT 3

Round Top DL #1H

Plugged

Fayette County · Giddings (Austin Chalk Gas) field  · Horizontal

Round Top DL #1H (API 42-149-32866) is a plugged horizontal well in Fayette County, plugged June 20, 2007, last operated by Chesapeake Operating Inc..

The RRC has issued one drilling permit (amended once), issued March 1, 1994, permitted to 12,975 ft.

Completion filings report one formation top, including Austin Chalk.

Operator of record

Chesapeake Operating Inc.

Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsChesapeake Operating, Inc.through Jun 2004
Latest permitChesapeake Operating, Inc.Mar 1, 1994
12,975
total depth, ft
2
permits on file
Mar 1, 1994
last permit issued
Sep 17, 1994
completed
0
cumulative oil, bbl
515K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Sep 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 17, 1994
Shut in
—
Plugged
Jun 20, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Round Top DL G-3-151507Giddings (Austin Chalk, Gas)Chesapeake Operating, Inc.10515KSep 1994 – Sep 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Sep 1994 → Jun 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
421608-98DrillChesapeake Operating, Inc.Jul 11, 1994Mar 1, 1994Jul 26, 199412,700
421608-99DrillTate, Larry V. Operating, Inc.Mar 1, 1994Mar 1, 1994—12,975

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-151507————

Formation tops

As filed on W-2/G-1. Subsea from 372 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk12,075-11,703

Perforations

Perforated and open-hole intervals.

FromToType
12,60614,861Perforated
12,63015,370Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,80014.751,280 S
7.62512,1009.8751,060 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 1994Oct 11, 1994Yes
00Nov 2, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14932866, documented in the API reference.