WELL · 42-149-32877 · DISTRICT 3

Roznov Gas Unit #2 #1

Plugged

Fayette County · Giddings (Austin Chalk Gas) field  · Horizontal · Sidetrack

Roznov Gas Unit #2 #1 (API 42-149-32877) is a plugged horizontal well in Fayette County, plugged July 25, 2019, last operated by Magnolia Oil & Gas Operating LLC.

The RRC has issued 2 drilling permits between 1994 and 1995, permitted to 13,200 ft.

It was permitted by Tana Oil And Gas Corporation and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Taylor, Austin Chalk.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Tana Oil and Gas Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 615 permits on file · (713) 345-6206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsEnervest Operating, L.L.C.through Dec 2012
Latest permitTana Oil and Gas CorporationFeb 3, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,200
total depth, ft
2
permits on file
Feb 3, 1995
last permit issued
May 18, 1994
completed
0
cumulative oil, bbl
199K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jul 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 18, 1994
Shut in
—
Plugged
Jul 25, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Roznov Gas Unit #2 G-3-150125Giddings (Austin Chalk, Gas)Magnolia Oil & Gas Operating LLC10199KMay 1994 – Jul 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tana Oil and Gas CorporationMay 1994 → Oct 1995
  2. 2Rosewood Resources, Inc.Nov 1995 → Aug 1999
  3. 3Emerald Operating Company, Inc.Sep 1999 → Aug 2008
  4. 4Enervest Operating, L.L.C.Sep 2008 → Dec 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
432295-99Recompletion · sidetrackTana Oil and Gas CorporationJan 27, 1995Feb 3, 1995Feb 7, 199513,000
422531-99DrillTana Oil and Gas CorporationMar 30, 1994Mar 31, 1994Apr 4, 199413,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-150125————

Formation tops

As filed on W-2/G-1. Subsea from 365 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox4,900-4,535
Taylor10,000-9,635
Austin Chalk11,550-11,185

Perforations

Perforated and open-hole intervals.

FromToType
12,45712,736Perforated
12,65713,928Perforated
12,68012,736Perforated
12,70513,569Perforated
12,73613,623Perforated
12,81813,569Perforated
12,81813,928Perforated
12,83615,172Perforated
13,31015,172Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,03514.751,029 S
7.62512,3049.875305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 11, 1995Jul 11, 1995—
00Aug 5, 1994Jun 15, 1994Yes
00Jul 27, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14932877, documented in the API reference.