WELL · 42-149-32913 · DISTRICT 3

Cedar Creek F Amarado Unit #06

N

Fayette County · Giddings (Austin Chalk-3) field  · Horizontal

Cedar Creek F Amarado Unit #06 (API 42-149-32913) is a horizontal well in Fayette County operated by Ineos USA Oil & Gas LLC, completed October 28, 1994.

The RRC has issued one drilling permit, issued August 9, 1994, permitted to 12,200 ft.

It was permitted by Edco Energy, Inc. and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.

Completion filings report one formation top, including Pecan Gap.

Its 2 leases have reported 119K barrels of oil and 1.23M mcf of gas since October 1994, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Ineos USA Oil & Gas LLC

Permitted by Edco Energy, Inc.; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed Apr 4, 2026 · 98 permits on file · (833) 402-7779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleIneos USA Oil & Gas LLC
Production reportsRedbud E & P, Inc.through Apr 2026
Latest permitEdco Energy, Inc.Aug 9, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,200
total depth, ft
1
permits on file
Aug 9, 1994
last permit issued
Oct 28, 1994
completed
119K
cumulative oil, bbl
1.23M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 28, 1994
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cedar Creek "F" Amarado Unit G-3-284249Giddings (Austin Chalk, Gas)Redbud E & P, Inc.1062.4KFeb 2018 – Jul 2026
Cedar Creek "F" Amarado Unit O-3-22591Giddings (Austin Chalk-3)Ineos USA Oil & Gas LLC2119K1.16MOct 1994 – Apr 2023

Gas, mcf lease total

Last 12 months 3,661 · prior 12 6,857(-47%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Edco Energy, Inc.Oct 1994 → Mar 1995
  2. 2Union Pacific Resources CompanyApr 1995 → Jan 2001
  3. 3Rme Petroleum CompanyFeb 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Jul 2007
  5. 5Enervest Operating, L.L.C.Aug 2007 → Sep 2015
  6. 6Crawford Hughes Operating Co.Feb 2018 → Jul 2019
  7. 7Ineos USA Oil & Gas LLCAug 2019 → May 2025
  8. 8Redbud E & P, Inc.Jun 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
426792-99DrillEdco Energy, Inc.Aug 9, 1994Aug 9, 1994Sep 1, 199412,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-284249————
—— O-3-22591————

Formation tops

As filed on W-2/G-1. Subsea from 375 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap9,925-9,550

Perforations

Perforated and open-hole intervals.

FromToType
10,68012,143Perforated
10,68012,143Open hole
10,68013,789Perforated
10,68013,789Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,28314.751,775 S
7.62510,3309.875335 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 5, 2018Mar 20, 2018—
00Feb 1, 1995Nov 16, 1994Yes
00Jan 20, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14932913, documented in the API reference.