WELL · 42-149-32974 · DISTRICT 3

Svrcek #1

Y

Fayette County · Giddings (Austin Chalk-3) field · Producing  · Horizontal

Svrcek #1 (API 42-149-32974) is a horizontal well in Fayette County operated by Magnolia Oil & Gas Operating LLC, completed May 24, 1995 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 1, 1995, permitted to 10,112 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 142K barrels of oil and 803K mcf of gas since May 1995, last reporting in July 2026.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 615 permits on file · (713) 345-6206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitGemini Exploration CompanyMay 1, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,112
total depth, ft
2
permits on file
May 1, 1995
last permit issued
May 24, 1995
completed
142K
cumulative oil, bbl
803K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 24, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Svrcek O-3-22750Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC1142K803KMay 1995 – Jul 2026

Oil, barrels lease total

Last 12 months 1,315 · prior 12 776(+69%)

050100150202420252026

Gas, mcf lease total

Last 12 months 5,596 · prior 12 4,401(+27%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Austin Chalk Co.Jun 1995 → Jan 2001
  2. 2Rme Austin Chalk CompanyFeb 2001 → Nov 2002
  3. 3Anadarko Austin Chalk CompanyDec 2002 → Feb 2006
  4. 4Anadarko E&P Company LPMar 2006 → Aug 2007
  5. 5Enervest Operating, L.L.C.Sep 2007 → Jul 2018
  6. 6Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
435386-98DrillUnion Pacific Resources CompanyJul 26, 1995May 1, 1995—10,112
435386-99DrillGemini Exploration CompanyMay 1, 1995May 1, 1995May 2, 19959,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22750————

Formation tops

As filed on W-2/G-1. Subsea from 300 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk9,379-9,079

Perforations

Perforated and open-hole intervals.

FromToType
9,46012,725Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,49014.751,300 S
7.6259,4609.875385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 1995Jun 27, 1995Yes
00Aug 1, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14932974, documented in the API reference.