WELL · 42-149-33051 · DISTRICT 3

Fidelitor #1

Y

Fayette County · Giddings (Austin Chalk-3) field · Producing  · Horizontal

Fidelitor #1 (API 42-149-33051) is a horizontal well in Fayette County operated by Magnolia Oil & Gas Operating LLC, completed July 19, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 3, 1997, permitted to 12,000 ft.

It was permitted by Arrow Exploration Company and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Navarro, Pecan Gap, Austin Chalk.

Its lease has reported 252K barrels of oil and 1.24M mcf of gas since July 1997, last reporting in July 2026.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Arrow Exploration Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 615 permits on file · (713) 345-6206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitArrow Exploration CompanyJun 3, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Jun 3, 1997
last permit issued
Jul 19, 1997
completed
252K
cumulative oil, bbl
1.24M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 19, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fidelitor O-3-23290Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC1252K1.24MJul 1997 – Jul 2026

Oil, barrels lease total

Last 12 months 287 · prior 12 816(-65%)

050100150202420252026

Gas, mcf lease total

Last 12 months 731 · prior 12 3,329(-78%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrow Exploration CompanyJul 1997 → Dec 2004
  2. 2Emerald Operating Company, Inc.Jan 2005 → Aug 2008
  3. 3Enervest Operating, L.L.C.Sep 2008 → Jul 2018
  4. 4Magnolia Oil & Gas Operating LLCAug 2018 → Nov 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
463214-99DrillArrow Exploration CompanyJun 3, 1997Jun 3, 1997Jun 4, 199712,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-23290————

Formation tops

As filed on W-2/G-1. Subsea from 260 ft elevation.Download CSV →

FormationMD ftSubsea
NavarroNAVARRO 'A'9,359-9,099
Pecan Gap10,769-10,509
Austin Chalk11,291-11,031

Perforations

Perforated and open-hole intervals.

FromToType
11,31114,272Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,54514.751,820 S
7.62511,3129.875420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 17, 1997Jul 29, 1997Yes
00Sep 11, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14933051, documented in the API reference.