WELL · 42-149-33110 · DISTRICT 3

Schmidt #1H

N

Fayette County · Giddings (Austin Chalk-3) field  · Horizontal

Schmidt #1H (API 42-149-33110) is a horizontal well in Fayette County operated by Magnolia Oil & Gas Operating LLC, completed June 21, 2001.

The RRC has issued one drilling permit, issued May 1, 2001, permitted to 10,000 ft.

It was permitted by Wcs Oil And Gas Corporation and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Carrizo, Pecan Gap, Austin Chalk.

Its 2 leases have reported 134K barrels of oil and 613K mcf of gas since June 2001, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by WCS Oil and Gas Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 X, filed May 6, 2026 · 615 permits on file · (713) 842-9050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitWCS Oil and Gas CorporationMay 1, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
1
permits on file
May 1, 2001
last permit issued
Jun 21, 2001
completed
134K
cumulative oil, bbl
613K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 21, 2001
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schmidt G-3-300979Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC102.05KAug 2025 – Jul 2026
Schmidt O-3-24030Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC1134K611KJun 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 2,896 · prior 12 3,324(-13%)

05001K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WCS Oil and Gas CorporationJun 2001 → Apr 2005
  2. 2WCS Oil & Gas CorporationMay 2005 → Aug 2021
  3. 3Magnolia Oil & Gas Operating LLCJan 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508426-99DrillWCS Oil and Gas CorporationMay 1, 2001May 1, 2001May 9, 200110,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-300979————
—— O-3-24030————

Formation tops

As filed on W-2/G-1. Subsea from 389 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo2,400-2,011
Pecan Gap7,995-7,606
Austin Chalk8,295-7,906

Perforations

Perforated and open-hole intervals.

FromToType
8,35011,814Perforated
8,35013,344Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,50012.25954 S
78,3508.75210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 2026Dec 18, 2025—
00Sep 13, 2001Jul 18, 2001Yes
00Aug 27, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/14933110, documented in the API reference.