WELL · 42-149-33228 · DISTRICT 3

Peebles Unit #1H

N

Fayette County · Wildcat field  · Horizontal

Peebles Unit #1H (API 42-149-33228) is a horizontal well in Fayette County operated by Oak Valley Operating LLC, completed September 9, 2011.

The RRC has issued one drilling permit, issued June 14, 2011, permitted to 17,000 ft.

It was permitted by Southern Bay Operating, L.L.C. and has since transferred to Oak Valley Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

Its 2 leases have reported 107K barrels of oil and 56.9K mcf of gas since September 2011, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Oak Valley Operating LLC

Permitted by Southern Bay Operating, L.L.C.; the EWA schedule now lists a different operator.

The Woodlands, TX · P-5 Y, filed Mar 4, 2016 · 62 permits on file · (281) 298-4246

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOak Valley Operating LLC
Production reportsSellers Lease Service, Inc.through Dec 2025
Latest permitSouthern Bay Operating, L.L.C.Jun 14, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
1
permits on file
Jun 14, 2011
last permit issued
Sep 9, 2011
completed
107K
cumulative oil, bbl
56.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 9, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peebles Unit O-3-26094Southern Bay (Eagle Ford)Flat Land Oil & Gas, LLC1107K56.9KFeb 2012 – Jul 2026
Peebles Unit O-3-25794WildcatOak Valley Operating, LLC100Sep 2011 – Sep 2013

Oil, barrels lease total

Last 12 months 1,008 · prior 12 1,483(-32%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 166(-100%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southern Bay Operating, L.L.C.Feb 2012 → Jun 2013
  2. 2Oak Valley Operating, LLCJul 2013 → Jun 2015
  3. 3Earthstone Operating, LLCJul 2015 → Dec 2020
  4. 4Flatonia Energy, LLCJan 2021 → Apr 2021
  5. 5Sellers Lease Service, Inc.May 2021 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
718162-99DrillSouthern Bay Operating, L.L.C.Jun 10, 2011Jun 14, 2011Aug 10, 201117,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-25794————
—— O-3-26094————

Formation tops

As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap8,755-8,398
Austin Chalk9,033-8,676
Eagle Ford9,728-9,371
Eagle FordEAGLE FORD (EAGLEVILLE)9,728-9,371

Perforations

Perforated and open-hole intervals.

FromToType
10,24914,968Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,86012.251,434 S
5.515,1008.751,797 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 21, 2015Aug 17, 2015—
00Jul 8, 2013Mar 6, 2012Yes
00May 31, 2012Dec 5, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.