WELL · 42-151-30859 · DISTRICT 7

Wickham J.W. #1

Plugged

Fisher County · Raven Creek (Strawn) field  · Vertical

Wickham J.W. #1 (API 42-151-30859) is a plugged well in Fisher County, plugged November 14, 1991, last operated by Hpc Operating Inc..

The RRC has issued 2 drilling permits between 1978 and 1985, permitted to 5,200 ft.

It was permitted by Hlh Petroleum Corporation and has since transferred to Hpc Operating Inc. on the wellbore schedule.

Its lease has reported 2.31K barrels of oil and 6.19K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

HPC Operating Inc.

Permitted by HLH Petroleum Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Apr 5, 1999 · 48 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHPC Operating Inc.
Production reportsAmerican Cascade Energy, Inc.through Oct 1996
Latest permitHLH Petroleum CorporationMay 21, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
2
permits on file
May 21, 1985
last permit issued
Jun 21, 1978
completed
2.31K
cumulative oil, bbl
6.19K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 21, 1978
Shut in
—
Plugged
Nov 14, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wickham, J.W. O-8-22585Raven Creek (Canyon Sand)American Cascade Energy, Inc.32.31K6.19KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Cascade Energy, Inc.Jan 1993 → Jan 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
275703-99RecompletionHLH Petroleum CorporationMay 20, 1985May 21, 1985—5,167
25060-99DrillU.S. Energy, Inc.May 24, 1978May 24, 1978May 26, 19785,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-22585————

Perforations

Perforated and open-hole intervals.

FromToType
4,2314,251Perforated
4,2704,278Perforated
4,8644,872Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512912.2585 S
2.3754,772——
4.55,1597.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 1985Jun 5, 1985—
00Jun 25, 1985——
00Jan 12, 1984Aug 14, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15130859, documented in the API reference.