WELL · 42-151-31535 · DISTRICT 7
Scott 'D' #1D
Fisher County · Vertical
Scott 'D' #1D (API 42-151-31535) is a plugged well in Fisher County, plugged July 8, 1982, last operated by Terrell Oil & Gas Production CO..
The RRC has issued 2 drilling permits between 1982 and 2014, permitted to 5,216 ft.
Completion filings report 10 formation tops, including Coleman Junction, Dothan Sand - Disposal, Noodle Creek - Disposal, Saddle Creek.
Its lease has reported 11.1K barrels of oil since June 2014, last reporting in July 2026.
Operator of record
Terrell Oil & Gas Production Co.
Hamlin, TX · P-5 Y, filed Nov 4, 2025 · 72 permits on file · (325) 669-1776
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Terrell Oil & Gas Production Co.through Apr 2026 |
| Latest permit | Terrell Oil & Gas Production Co.Apr 15, 2014 |
- 5,216
- total depth, ft
- 2
- permits on file
- Apr 15, 2014
- last permit issued
- —
- completed
- 11.1K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jul 8, 1982
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scott 'D' O-8-31591 | Noodle, NW. (Canyon Sd. 4100) | Terrell Oil & Gas Production Co. | 1 | 11.1K | 0 | Jun 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 177 · prior 12 212(-17%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Terrell Oil & Gas Production Co.Jun 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 781580-99 | Reenter | Terrell Oil & Gas Production Co. | Mar 7, 2014 | Apr 15, 2014 | May 15, 2014 | 4,900 |
| 165294-99 | Drill | Hopehill Petroleum Co., Inc. | Jul 1, 1982 | Jul 1, 1982 | Jun 29, 1982 | 5,216 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31591 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,803 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO | 2,350 | -547 |
| Dothan Sand - Disposal | 2,590 | -787 |
| Noodle Creek - Disposal | 2,690 | -887 |
| Saddle CreekSADDLE CREEK - DISPOSAL | 2,900 | -1,097 |
| Flippen - Disposal | 2,950 | -1,147 |
| Breckenridge - Disposal | 3,260 | -1,457 |
| CiscoCISCO (REEF, LIME, SAND) - DISPO | — | — |
| Crystal Falls - Disposal | — | — |
| Hope - Disposal | — | — |
| San AndresSAN ANDRES - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,086 | 4,256 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 205 | 12.25 | 180 S |
| 4.5 | 4,318 | 7.875 | 725 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 19, 2014 | Jul 15, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-31535 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-31535 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15131535, documented in the API reference.