WELL · 42-151-32004 · DISTRICT 7

Burnett Alice #1A

Plugged

Fisher County · P-J (Ellenburger) field  · Vertical

Burnett Alice #1A (API 42-151-32004) is a plugged well in Fisher County, plugged August 5, 1987, last operated by Genie Corporation.

The RRC has issued one drilling permit, issued July 23, 1985, permitted to 8,000 ft.

Completion filings report 2 formation tops, including Strawn, Ellenburger.

Operator of record

Genie Corporation

Abilene, TX · P-5 Y, filed Dec 6, 1996 · 44 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGenie Corporation
Production reportsnone
Latest permitGenie CorporationJul 23, 1985
8,000
total depth, ft
1
permits on file
Jul 23, 1985
last permit issued
Oct 4, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 4, 1985
Shut in
—
Plugged
Aug 5, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
280831-99DrillGenie CorporationJul 23, 1985Jul 23, 1985—8,000

Formation tops

As filed on W-2/G-1. Subsea from 2,128 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn6,850-4,722
Ellenburger7,030-4,902

Perforations

Perforated and open-hole intervals.

FromToType
7,0307,105Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522012.25160 S
4.57,114—1,090 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 1985Oct 17, 1985Yes
00Nov 6, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132004, documented in the API reference.