WELL · 42-151-32234 · DISTRICT 7

Round Top /Palo Pinto Reef/ #184

Y

Fisher County · Round Top (Palo Pinto Reef) field · Injection  · Vertical

Round Top /Palo Pinto Reef/ #184 (API 42-151-32234) is a well in Fisher County operated by L.C.S. Production Company, completed March 1, 1990 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 15, 1989, permitted to 5,050 ft.

It was permitted by Conoco Inc. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report one formation top, including Palo Pinto.

Its lease has reported 4.98M barrels of oil and 6.03M mcf of gas since January 1993, last reporting in July 2026. The lease carries 149 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 298K barrels injected in the 12 months reported through November 2025.

Operator of record

L.C.S. Production Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitConoco Inc.Nov 15, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,050
total depth, ft
1
permits on file
Nov 15, 1989
last permit issued
Mar 1, 1990
completed
4.98M
cumulative oil, bbl
6.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 149 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Round Top /Palo Pinto Reef/ O-8-11416Round Top (Palo Pinto Reef)L.C.S. Production Company1494.98M6.03MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 20,746 · prior 12 27,305(-24%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 719(-100%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Jan 1993 → Jan 1996
  2. 2Enervest Operating, L.L.C.Feb 1996 → Feb 1998
  3. 3Coda Energy, Inc.Mar 1998 → Aug 1998
  4. 4Belco Energy Corp.Sep 1998 → Feb 2002
  5. 5Westport Oil and Gas Company, LPMar 2002 → Feb 2006
  6. 6Kerr-McGee Oil & Gas Onshore LPMar 2006 → May 2007
  7. 7Apache CorporationJun 2007 → Feb 2020
  8. 8Crossroads Operating, LLCMar 2020 → Jan 2025
  9. 9L.C.S. Production CompanyFeb 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366366-99DrillConoco Inc.Nov 13, 1989Nov 15, 1989—5,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-11416————

Formation tops

As filed on W-2/G-1. Subsea from 1,877 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO REEF4,786-2,909

Perforations

Perforated and open-hole intervals.

FromToType
4,7864,838Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62522812.25200 S
75,0508.75280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 1990May 14, 1990—
00Jun 7, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

298K
bbl, last 12 reported months
24.4M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000072766H-1 InjectionActive3,5001,0004,580–4,840

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 297,961 · prior 12 619,702(-52%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132234, documented in the API reference.