WELL · 42-151-32434 · DISTRICT 7

Norsworthy #5

Y

Fisher County · Newman (Swastika) field · Injection  · Vertical

Norsworthy #5 (API 42-151-32434) is a well in Fisher County operated by Cholla Petroleum Inc., completed September 14, 1995 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 22, 1994, permitted to 3,999 ft.

Completion filings report 3 formation tops, including Noodle Creek, Saddle Creek, Flippen.

Its lease has reported 378K barrels of oil and 93.4K mcf of gas since September 1994, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 42.1K barrels injected in the 12 months reported through November 2025.

Operator of record

Cholla Petroleum Inc.

Dallas, TX · P-5 Y, filed Feb 4, 2026 · 1,085 permits on file · (800) 839-2955

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCholla Petroleum Inc.
Production reportsCholla Petroleum, Inc.through Apr 2026
Latest permitCholla Petroleum, Inc.Dec 22, 1994
3,999
total depth, ft
2
permits on file
Dec 22, 1994
last permit issued
Sep 14, 1995
completed
378K
cumulative oil, bbl
93.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 14, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Norsworthy O-8-27279Newman (Swastika)Cholla Petroleum, Inc.5378K93.4KSep 1994 – Jul 2026

Oil, barrels lease total

Last 12 months 2,387 · prior 12 1,503(+59%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cholla Petroleum, Inc.Sep 1994 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431116-98DrillCholla Petroleum, Inc.Aug 15, 1995Dec 22, 1994—3,999
431116-99DrillCholla Petroleum, Inc.Dec 19, 1994Dec 22, 1994—3,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27279————

Formation tops

As filed on W-2/G-1. Subsea from 1,962 ft elevation.Download CSV →

FormationMD ftSubsea
Noodle Creek3,000-1,038
Saddle Creek3,100-1,138
Flippen3,200-1,238

Perforations

Perforated and open-hole intervals.

FromToType
3,7803,790Perforated
3,7823,786Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.2590 S
8.62513012.2590 S
5.53,8197.875155 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 2024Sep 18, 2024—
00Dec 17, 2003Oct 2, 2003—
00Nov 14, 1995Sep 22, 1995Yes
00Oct 9, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

42.1K
bbl, last 12 reported months
652K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093307H-1 InjectionActive6001,8503,780–3,790

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 42,086 · prior 12 32,490(+30%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132434, documented in the API reference.