WELL · 42-151-32581 · DISTRICT 7
Reed Billy #1
Fisher County · Rough Ride (Strawn Sd.) field · Vertical
Reed Billy #1 (API 42-151-32581) is a plugged well in Fisher County, plugged March 1, 2007, last operated by Sinclair Oil & Gas Company.
The RRC has issued 2 drilling permits between 2002 and 2007, permitted to 6,200 ft.
Completion filings report 2 formation tops, including Rough Ride Canyon, Rough Ride Strawn.
Its 2 leases have reported 6.46K barrels of oil and 61.7K mcf of gas since August 2002, last reporting in September 2007. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Salt Lake Cty, UT · P-5 Y, filed Aug 5, 2022 · 49 permits on file · (801) 557-2965
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sinclair Oil & Gas Company |
| Production reports | Sinclair Oil Corporationthrough May 2005 |
| Latest permit | Sinclair Oil & Gas CompanyJul 26, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,200
- total depth, ft
- 2
- permits on file
- Jul 26, 2007
- last permit issued
- Aug 12, 2002
- completed
- 6.46K
- cumulative oil, bbl
- 61.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2002 THROUGH Sep 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 12, 2002
- Shut in
- —
- Plugged
- Mar 1, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Reed, Billy O-8-29157 | Rough Ride (Strawn Sd.) | Sinclair Oil & Gas Company | 1 | 6.46K | 61.7K | Aug 2002 – Sep 2007 |
| Reed, Billy O-8-29971 | Rough Ride (Canyon) | Sinclair Oil & Gas Company | 1 | 0 | 0 | Feb 2006 – Sep 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sinclair Oil CorporationAug 2002 → May 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 639817-99 | Recompletion | Sinclair Oil & Gas Company | May 30, 2007 | Jul 26, 2007 | Nov 8, 2005 | 5,890 |
| 520838-99 | Drill | Sinclair Oil Corporation | Jun 11, 2002 | Jun 11, 2002 | Jun 24, 2002 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29157 | — | — | — | — |
| — | — O-8-29971 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,083 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rough Ride Canyon | 4,972 | -2,889 |
| Rough Ride Strawn | 6,004 | -3,921 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,984 | 4,996 | Perforated |
| 6,004 | 6,014 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 236 | 11 | 140 S |
| 5.5 | 6,085 | 7.875 | 634 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 10, 2007 | Feb 23, 2006 | Yes |
| 00 | Sep 20, 2007 | — | — |
| 00 | Oct 10, 2002 | Aug 29, 2002 | Yes |
| 00 | Sep 26, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-32581 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-32581 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.