WELL · 42-151-32701 · DISTRICT 7

Robinson 18 #1 H

Y

Fisher County · Rough Draw (Noodle Creek) field · Shut IN  · Horizontal

Robinson 18 #1 H (API 42-151-32701) is a horizontal well in Fisher County operated by Halliburton Operating Company, completed December 1, 2009 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 8, 2008, permitted to 3,700 ft.

Completion filings report 3 formation tops, including Top Of Dothan, Base Of Dothan, Top Of Noodle Creek.

Its lease has reported 15.1K barrels of oil since December 2009, last reporting in July 2026.

Operator of record

Halliburton Operating Company

Plano, TX · P-5 Y, filed Oct 4, 2025 · 108 permits on file · (214) 662-1405

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHalliburton Operating Company
Production reportsHalliburton Operating Companythrough Mar 2020
Latest permitHalliburton Operating CompanyJul 8, 2008
3,700
total depth, ft
2
permits on file
Jul 8, 2008
last permit issued
Dec 1, 2009
completed
15.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robinson "18" O-8-30900Rough Draw (Noodle Creek)Halliburton Operating Company115.1K0Dec 2009 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Halliburton Operating CompanyDec 2009 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
664767-98DrillHalliburton Operating CompanyJun 25, 2009Jul 8, 2008Jul 15, 20093,700
664767-99DrillHalliburton Operating CompanyJun 18, 2008Jul 8, 2008—3,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-30900————

Formation tops

As filed on W-2/G-1. Subsea from 1,910 ft elevation.Download CSV →

FormationMD ftSubsea
Top of Dothan3,418-1,508
Base of Dothan3,665-1,755
Top of Noodle Creek3,736-1,826

Perforations

Perforated and open-hole intervals.

FromToType
4,3037,000Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62516412.25120 S
74,3038.75350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 26, 2012Jan 11, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132701, documented in the API reference.