WELL · 42-151-32736 · DISTRICT 8

Nunn #3WD

N

Fisher County  · Vertical

Nunn #3WD (API 42-151-32736) is a former disposal or injection well in Fisher County, last operated by L.C.S. Production Company; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 2008 and 2012, permitted to 7,500 ft.

Operator of record

L.C.S. Production Company

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitL.C.S. Production CompanyApr 18, 2012
7,500
total depth, ft
2
permits on file
Apr 18, 2012
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
737406-99ReenterL.C.S. Production CompanyApr 2, 2012Apr 18, 2012—7,500
671574-99DrillSBJ Oil & GasSep 22, 2008Oct 4, 2008—7,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104774W-14 DisposalCanceled Apr 21, 20155,0003,3256,650–7,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15132736, documented in the API reference.