WELL · 42-151-32968 · DISTRICT 7
Willingham Ranch E/2/68/E #5DX
Fisher County · Que (Noodle Creek) field · Vertical
Willingham Ranch E/2/68/E #5DX (API 42-151-32968) is a plugged well in Fisher County, plugged June 11, 2025, last operated by Denton Exploration Inc..
The RRC has issued one drilling permit (amended once), issued October 18, 2013, permitted to 4,990 ft.
Completion filings report 10 formation tops, including Coleman Junction, Dothan Sand - Disposal, Noodle Creek - Disposal, Breckenridge - Disposal.
Its lease has reported 1.58K barrels of oil since July 2015, last reporting in July 2026.
Operator of record
Dallas, TX · P-5 Y, filed Dec 4, 2025 · 86 permits on file · (214) 969-0100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Denton Exploration Inc. |
| Production reports | Denton Exploration, Inc.through Jan 2024 |
| Latest permit | Denton Exploration, Inc.Oct 18, 2013 |
- 4,990
- total depth, ft
- 2
- permits on file
- Oct 18, 2013
- last permit issued
- Jul 2, 2015
- completed
- 1.58K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 2, 2015
- Shut in
- —
- Plugged
- Jun 11, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Willingham Ranch E/2/68/E O-8-31831 | Que (Noodle Creek) | Denton Exploration, Inc. | 1 | 1.58K | 0 | Jul 2015 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Denton Exploration, Inc.Jul 2015 → Jan 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 771588-98 | Drill | Denton Exploration, Inc. | Apr 1, 2015 | Oct 18, 2013 | May 2, 2015 | 4,990 |
| 771588-99 | Drill | Denton Exploration, Inc. | Oct 10, 2013 | Oct 18, 2013 | — | 4,990 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31831 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,127 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO | 2,420 | -293 |
| Dothan Sand - Disposal | 3,650 | -1,523 |
| Noodle Creek - Disposal | 4,107 | -1,980 |
| Breckenridge - Disposal | — | — |
| CiscoCISCO (REEF, LIME, SAND) - DISPO | — | — |
| Crystal Falls - Disposal | — | — |
| Flippen - Disposal | — | — |
| Hope - Disposal | — | — |
| Saddle CreekSADDLE CREEK - DISPOSAL | — | — |
| San AndresSAN ANDRES - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,109 | 4,115 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 210 | 12.25 | 170 S |
| 5.5 | 4,260 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 27, 2015 | Jul 9, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-32968 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-32968 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15132968, documented in the API reference.