WELL · 42-151-33072 · DISTRICT 7
Willingham Ranch E/2/68/DU #7DX
Fisher County · Que (Noodle Creek) field · Vertical
Willingham Ranch E/2/68/Du #7DX (API 42-151-33072) is a plugged well in Fisher County, plugged April 21, 2021, last operated by Denton Exploration Inc..
The RRC has issued one drilling permit, issued December 30, 2016, permitted to 4,990 ft.
Completion filings report 10 formation tops, including Coleman Junction, Dothan Sand - Disposal, Noodle Creek - Disposal, Breckenridge - Disposal.
Its lease has reported 1.89K barrels of oil since October 2013, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Dec 4, 2025 · 86 permits on file · (214) 969-0100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Denton Exploration Inc. |
| Production reports | Denton Exploration, Inc.through Feb 2024 |
| Latest permit | Denton Exploration, Inc.Dec 30, 2016 |
- 4,990
- total depth, ft
- 1
- permits on file
- Dec 30, 2016
- last permit issued
- Jan 24, 2017
- completed
- 1.89K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 24, 2017
- Shut in
- —
- Plugged
- Apr 21, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Willingham Ranch E/2/68/DU O-8-31353 | Que (Noodle Creek) | Denton Exploration, Inc. | 2 | 1.89K | 0 | Oct 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Denton Exploration, Inc.Dec 2013 → Feb 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 821383-99 | Drill | Denton Exploration, Inc. | Dec 16, 2016 | Dec 30, 2016 | Jan 18, 2017 | 4,990 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31353 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,166 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO | 3,593 | -1,427 |
| Dothan Sand - Disposal | 3,918 | -1,752 |
| Noodle Creek - Disposal | 4,007 | -1,841 |
| Breckenridge - Disposal | — | — |
| CiscoCISCO (REEF, LIME, SAND) - DISPO | — | — |
| Crystal Falls - Disposal | — | — |
| Flippen - Disposal | — | — |
| Hope - Disposal | — | — |
| Saddle CreekSADDLE CREEK - DISPOSAL | — | — |
| San AndresSAN ANDRES - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,155 | 4,163 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 210 | 12.25 | 170 S |
| 5.5 | 4,305 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 2017 | Mar 20, 2017 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-33072 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-33072 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15133072, documented in the API reference.