WELL · 42-151-33302 · DISTRICT 7

Sojo-Touchstone #3

Y

Fisher County · Keeler-Wimberly (Canyon Sd.) field · Injection  · Vertical

Sojo-Touchstone #3 (API 42-151-33302) is a well in Fisher County operated by L.C.S. Production Company, completed January 21, 2023 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 5, 2022, permitted to 5,990 ft.

Completion filings report 10 formation tops, including Coleman Junction, Dothan Sand - Disposal, Noodle Creek - Disposal, Saddle Creek.

Its lease has reported 27.6K barrels of oil and 39.9K mcf of gas since January 2023, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 90.4K barrels injected in the 12 months reported through November 2025; TexNet located 0 M2+ earthquakes within 10 km over the last two years.

Operator of record

L.C.S. Production Company

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitL.C.S. Production CompanyDec 5, 2022
5,990
total depth, ft
1
permits on file
Dec 5, 2022
last permit issued
Jan 21, 2023
completed
27.6K
cumulative oil, bbl
39.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2023 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 21, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

32.612678, -100.168967

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Fisher County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sojo-Touchstone O-8-32667Keeler-Wimberly (Canyon Sd.)L.C.S. Production Company927.6K39.9KJan 2023 – Jul 2026

Oil, barrels lease total

Last 12 months 8,346 · prior 12 4,843(+72%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 10,569 · prior 12 6,307(+68%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyMar 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
886076-99DrillL.C.S. Production CompanyNov 29, 2022Dec 5, 2022Dec 12, 20225,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32667————

Formation tops

As filed on W-2/G-1. Subsea from 1,866 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO2,300-434
Dothan Sand - Disposal2,522-656
Noodle Creek - Disposal2,624-758
Saddle CreekSADDLE CREEK - DISPOSAL2,784-918
Flippen - Disposal2,893-1,027
CiscoCISCO (REEF, LIME, SAND) - DISPO2,908-1,042
Hope - Disposal3,012-1,146
Crystal Falls - Disposal3,051-1,185
Breckenridge - Disposal3,207-1,341
San AndresSAN ANDRES - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
4,1814,206Perforated
4,2154,223Perforated
4,2354,238Perforated
4,2714,276Perforated
4,2964,309Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512912.25100 S
5.54,4677.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 23, 2023Jan 30, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Sojo-Touchstone42-151-00631

0.2 KM · L.C.S. Production Company · Section with this well →

Swastika Sand3,310-1,428

Sojo-Touchstone42-151-33276

0.3 KM · L.C.S. Production Company · Section with this well →

San Andres3421,523
Coleman Junction2,292-427
Dothan Sand - Disposal2,513-648
Noodle Creek - Disposal2,617-752
Saddle Creek2,776-911
Flippen - Disposal2,892-1,027
Cisco2,976-1,111
Hope - Disposal3,001-1,136

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33282

0.3 KM · L.C.S. Production Company · Section with this well →

San Andres3421,508
Coleman Junction2,208-358
Dothan Sand - Disposal2,506-656
Noodle Creek - Disposal2,611-761
Saddle Creek2,772-922
Flippen - Disposal2,880-1,030
Cisco2,968-1,118
Hope - Disposal2,990-1,140

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33269

0.3 KM · L.C.S. Production Company · Section with this well →

San Andres3651,528
Coleman Junction2,311-418
Dothan Sand - Disposal2,530-637
Noodle Creek - Disposal2,636-743
Saddle Creek2,800-907
Flippen - Disposal2,912-1,019
Cisco2,998-1,105
Hope - Disposal3,027-1,134

10 TOPS · FIRST 8

Touchstone, Lila42-151-33313

0.4 KM · L.C.S. Production Company · Section with this well →

San Andres3451,500
Coleman Junction2,162-317
Dothan Sand - Disposal2,506-661
Noodle Creek - Disposal2,609-764
Saddle Creek2,766-921
Flippen - Disposal2,870-1,025
Cisco2,962-1,117
Hope - Disposal2,981-1,136

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33270

0.4 KM · L.C.S. Production Company · Section with this well →

San Andres3821,514
Coleman Junction2,217-321
Dothan Sand - Disposal2,561-665
Noodle Creek - Disposal2,661-765
Saddle Creek2,820-924
Flippen - Disposal2,906-1,010
Cisco3,029-1,133
Hope - Disposal3,061-1,165

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33281

0.4 KM · L.C.S. Production Company · Section with this well →

San Andres3401,514
Coleman Junction2,172-318
Dothan Sand - Disposal2,515-661
Noodle Creek - Disposal2,610-756
Saddle Creek2,774-920
Flippen - Disposal2,878-1,024
Cisco2,979-1,125
Hope - Disposal3,004-1,150

10 TOPS · FIRST 8

Touchstone A42-151-33107

0.5 KM · RHB Exploration & Production,llc · Section with this well →

Coleman Junction1,74496
Noodle Creek - Disposal2,660-820
Flippen - Disposal—
Breckenridge - Disposal—
Dothan Sand - Disposal—
Crystal Falls - Disposal—
Cisco—
Hope - Disposal—

10 TOPS · FIRST 8

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

90.4K
bbl, last 12 reported months
209K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000125552H-1 InjectionActive2,0002,0004,000–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 90,356 · prior 12 76,379(+18%)

05K10K20242025

TexNet catalog via USGS

Seismicity near this well

0
M2+ events within 10 km, last 2 years
—
largest

A proximity count, not an attribution. How to read it →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15133302, documented in the API reference.