WELL · 42-151-33318 · DISTRICT 7

Sojo-Touchstone #15

N

Fisher County · Raven Creek (Strawn 4980) field  · Vertical

Sojo-Touchstone #15 (API 42-151-33318) is a well in Fisher County operated by L.C.S. Production Company, completed April 30, 2023.

The RRC has issued 2 drilling permits between 2023 and 2025, permitted to 5,990 ft.

Completion filings report 10 formation tops, including San Andres, Coleman Junction, Dothan Sand - Disposal, Noodle Creek - Disposal.

Its 2 leases have reported 37.1K barrels of oil and 56.1K mcf of gas since November 2022, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitL.C.S. Production CompanyNov 6, 2025
5,990
total depth, ft
2
permits on file
Nov 6, 2025
last permit issued
Apr 30, 2023
completed
37.1K
cumulative oil, bbl
56.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2022 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 30, 2023
Shut in
—
Plugged
—

Surface location

32.616451, -100.163371

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Fisher County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sojo-Touchstone O-8-32655Raven Creek (Strawn 4980)L.C.S. Production Company29.42K16.2KNov 2022 – Jul 2026
Sojo-Touchstone O-8-32667Keeler-Wimberly (Canyon Sd.)L.C.S. Production Company927.6K39.9KJan 2023 – Jul 2026

Oil, barrels lease total

Last 12 months 8,958 · prior 12 7,603(+18%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 11,163 · prior 12 13,564(-18%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyDec 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
911635-99RecompletionL.C.S. Production CompanyNov 5, 2025Nov 6, 2025Oct 1, 20255,400
889302-99DrillL.C.S. Production CompanyMar 24, 2023Mar 27, 2023Apr 6, 20235,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32655————
—— O-8-32667————

Formation tops

As filed on W-2/G-1. Subsea from 1,854 ft elevation.Download CSV →

FormationMD ftSubsea
San AndresSAN ANDRES - DISPOSAL3461,508
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO2,171-317
Dothan Sand - Disposal2,514-660
Noodle Creek - Disposal2,620-766
Saddle CreekSADDLE CREEK - DISPOSAL2,775-921
Flippen - Disposal2,892-1,038
CiscoCISCO (REEF, LIME, SAND) - DISPO2,987-1,133
Hope - Disposal3,013-1,159
Crystal Falls - Disposal3,052-1,198
Breckenridge - Disposal3,202-1,348

Perforations

Perforated and open-hole intervals.

FromToType
4,1684,264Perforated
4,9324,936Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62511912.25100 S
5.55,4427.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 2025Nov 7, 2025Yes
00Jul 13, 2023May 24, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Sojo-Touchstone -A-42-151-33294

0.3 KM · L.C.S. Production Company · Section with this well →

Coleman Junction2,153-316
Dothan Sand - Disposal2,504-667
Noodle Creek - Disposal2,607-770
Saddle Creek2,762-925
Flippen - Disposal2,865-1,028
Cisco2,966-1,129
Hope - Disposal2,990-1,153
Crystal Falls - Disposal3,035-1,198

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33281

0.3 KM · L.C.S. Production Company · Section with this well →

San Andres3401,514
Coleman Junction2,172-318
Dothan Sand - Disposal2,515-661
Noodle Creek - Disposal2,610-756
Saddle Creek2,774-920
Flippen - Disposal2,878-1,024
Cisco2,979-1,125
Hope - Disposal3,004-1,150

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33276

0.4 KM · L.C.S. Production Company · Section with this well →

San Andres3421,523
Coleman Junction2,292-427
Dothan Sand - Disposal2,513-648
Noodle Creek - Disposal2,617-752
Saddle Creek2,776-911
Flippen - Disposal2,892-1,027
Cisco2,976-1,111
Hope - Disposal3,001-1,136

10 TOPS · FIRST 8

Sojo-Touchstone -A-42-151-33286

0.4 KM · L.C.S. Production Company · Section with this well →

San Andres3271,510
Coleman Junction2,275-438
Dothan Sand - Disposal2,498-661
Noodle Creek - Disposal2,599-762
Saddle Creek2,761-924
Flippen - Disposal2,875-1,038
Cisco2,965-1,128
Hope - Disposal2,989-1,152

10 TOPS · FIRST 8

Sojo-Touchstone -A-42-151-33334

0.5 KM · L.C.S. Production Company · Section with this well →

San Andres3361,498
Coleman Junction2,164-330
Dothan Sand - Disposal2,514-680
Noodle Creek - Disposal2,615-781
Saddle Creek2,819-985
Flippen - Disposal2,872-1,038
Cisco2,980-1,146
Hope - Disposal2,997-1,163

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33338

0.6 KM · L.C.S. Production Company · Section with this well →

Coleman Junction2,195-307
Noodle Creek - Disposal2,678-790
Saddle Creek2,802-914
Flippen - Disposal2,908-1,020
Cisco3,009-1,121
Hope - Disposal3,035-1,147
Breckenridge - Disposal3,228-1,340
San Andres—

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33282

0.6 KM · L.C.S. Production Company · Section with this well →

San Andres3421,508
Coleman Junction2,208-358
Dothan Sand - Disposal2,506-656
Noodle Creek - Disposal2,611-761
Saddle Creek2,772-922
Flippen - Disposal2,880-1,030
Cisco2,968-1,118
Hope - Disposal2,990-1,140

10 TOPS · FIRST 8

Sojo-Touchstone42-151-33270

0.7 KM · L.C.S. Production Company · Section with this well →

San Andres3821,514
Coleman Junction2,217-321
Dothan Sand - Disposal2,561-665
Noodle Creek - Disposal2,661-765
Saddle Creek2,820-924
Flippen - Disposal2,906-1,010
Cisco3,029-1,133
Hope - Disposal3,061-1,165

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15133318, documented in the API reference.