WELL · 42-155-30357 · DISTRICT 9

Kajs #1

Plugged

Foard County · Thalia N. (Canyon) field  · Vertical

Kajs #1 (API 42-155-30357) is a plugged well in Foard County, plugged May 8, 2001, last operated by Mid-Continental Exploration Inc..

The RRC has issued one drilling permit, issued August 24, 1983, permitted to 2,400 ft.

It was permitted by Nebo Operating Company, Inc. and has since transferred to Mid-Continental Exploration Inc. on the wellbore schedule.

Completion filings report one formation top, including Tot Lignite Maker.

Operator of record

Mid-Continental Exploration Inc.

Permitted by Nebo Operating Company, Inc.; the EWA schedule now lists a different operator.

Sanger, TX · P-5 Y, filed Feb 4, 2022 · 95 permits on file · (972) 571-0563

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMid-Continental Exploration Inc.
Production reportsMid-Continental Exploration,inc.through Mar 1995
Latest permitNebo Operating Company, Inc.Aug 24, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,400
total depth, ft
1
permits on file
Aug 24, 1983
last permit issued
Dec 3, 1983
completed
0
cumulative oil, bbl
2
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 3, 1983
Shut in
—
Plugged
May 8, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kajs G-13-115032Thalia, N. (Canyon)Mid-Continental Exploration,inc.102Jan 1993 – May 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mid-Continental Exploration,inc.Mar 1995 → Mar 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
207187-99DrillNebo Operating Company, Inc.Aug 18, 1983Aug 24, 1983—2,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-115032————

Formation tops

As filed on W-2/G-1. Subsea from 1,365 ft elevation.Download CSV →

FormationMD ftSubsea
Tot Lignite Maker988377

Perforations

Perforated and open-hole intervals.

FromToType
9991,072Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512112.25250 S
5.51,1507.87585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 12, 1985Feb 21, 1985—
00Mar 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15530357, documented in the API reference.